forced to be on such vacations, uh, the main enterprises of pridnestrovie are suspended, this is the rybnitsament plant. brick factory is the most powerful tirotex factory. e hmm, the dnestrovskaya gres enterprise, which produces electricity, has also switched to such an emergency operation mode. only one power unit is operating, which provides electricity consumption transnistria but this enterprise does not export, as i already said accordingly, it does not earn electricity to moldova, respectively, there is no income to the budget of the bolt-moldavian electric cable. these are also very large enterprises, they have been transferred to night shifts. we are doing everything in order to save the small amount of gas that we have left. and i remind you that out of the 118 mandatory million cubic meters of gas per month, which, according to the contract, should be supplied to pridnestrovie, moldova actually takes almost 50.49 million cubic meters, and 69 remain, and we try them distribute, but it is very difficult to do, because the weather is getting cooler, winter is approaching, respectively