>> saechb 7 minutes and 3 minute for rebuttal time >> what the building department mentioned about a letter b soph the structural engineering report and this is a little small but it was shown on the definition. the second paragraph is only a recommendation, it has nothing to do with what is the general findings and observation during the inspection. now, the same recommendation was built in by the soil engineer so that can not be used against the property because it is only a recommendation and what is mentioned in the report is that whatever you have there is part of the norm lal wear and tear when it comes to structure and doesn't pose a safety hazard at this point. thank you very much. >> thank you. the department has 7 minutes. >> just for clarification to the city attorney, should i represent our original report or should i just act as rebuttal? >> the board has granted rehearing based on the new efds they are interested hearing about the new evidence at issue. >> thank you. just to comment on the engineering report, it acknowledged that the height of the wall is 4 feet, theref