saman gadidi news of radio and television. completion of the implementation of the second line of water transmission from sad drudzan to shiraz. according to the general manager of fars regional water authority this project, which was implemented with a credit of 6 thousand billion tomans, includes 77 kilometers of pipelines, pumping stations and treatment plants, and 3 tanks of 20 thousand cubic meters. the second line of water transmission from sad darudzen to shirazi city , which started in 2010. we reduced the length of the first line from 127 km to 77 km. a 444 meter long tunnel that has shortened the route. energy consumption and maintenance costs of the line have been greatly reduced. because of this, we built a 4.5 km long tunnel in beizah plain , which is part of the special projects in tunnel construction. also, the construction of a treatment plant with a capacity of 30 liters per second and the pumping power of 250 meters, as well as the construction of three tanks. 200 concrete blocks that store 60,000 cubic meter