at the great depth, it takes one hour to lay new underground communications to the city of samur.h this kolya 100 km. plus, near akademgorodok we are now constructing a station for the second rise, that is, water will come here from here too. it will now be directed directly to the frunzensky and moskovsky districts with great pressure, but we already have a little bit of the oktyabrsky district there, to understand these pipes have a diameter from one meter to one meter, 20 m, 100 km. these are the diameters, friend, but now it works about the same. i think we've done about 40 percent of the pipe laying that's required. eh, until july next year. we plan to completely complete all construction work. checking the cleaning of pipes and feasting propampoak on their artesian water i will give that every day minsk with an elderly college has 370,000 cubic meters of water, well, you command the project and the reserve and volume of hungry brightness. the guarantors will ensure the ruin on the above-ground highways near the capital acts, work will be carried out to arrest the walkie-talk