we have since then worked with the san francisco public work squz the san francisco metropolitan transportation authority to streamline vehicle ingress and egress. we hired sfpd officers for traffic control at the entrance to keep down traffic and insure pedestrian and bike safety at terminal entrance and exist. a issue that caused a lot of the back up is people come up the embarcadero north bound and pull over on to the bike lane to look at passengers off instead of going into the terminal. this blocked the lane which blocks the embark dareee. since then we filled in 4 old drive ways to discourage that. we installed nono parking and pier twaevl pick up and drop up signsism we installed vehicle [inaudible] in the drive way and installed other new signs to prevent the seek vas from stopping on the embark dairy. we are also in the process of reconfiguring the entrance and exist to the gta that allows smoothder transit and we work with mta to wurk on the electric meter signs you see by the ball park. they will let people know what is gogoing on and what the delay is for and offer different traffic routes. w