addition to that discussion , we also have 20,000 megawatts of thermal electricity production in sarjam, that is , nuclear and thermal renewables. the task of the seventh plan is that 35,000 megawatts of electricity production in the country should be increased. it is in line with the 7th plan, and clearly, what is the task of resolving the imbalance in their plan, what is the task seen in the 7th plan, well , they also see the increase in the discussion, the imbalance is naturally caused by the lack of sufficient supply, i.e. the lack of sufficient electricity production. and from this side, the consumption is excessive, which means that we will not solve these two challenges, that is, the issue of increasing production if we don't have control over consumption, naturally, this imbalance will not be resolved. the 7th plan is a specific task. at the end of the program, this imbalance must be eliminated. this year, we have 17,000 megawatts of imbalance, that is, 20 large power plants, which is a very large number, even if we have money now. it's not that we have money now , but that a po