review went on with this permit and dbi issued the permit in august of 2010, so it has been heavily scrutized, in fact if you take a look at the project plan they show both the condition before the 2000 permit and the current condition and although we don't know if it was done to the code or not and the third images are what are proposed today and you will also see that the walls are broken down to the degree of what was the original construction and what was the construction since 2004 and what walls are being removed and very, very detailed information. >> and planning dbi and all of the relevant agencies have approved the current permit and so we have spoken with john and the appellant representative about the construction concerns and i think that we can respond to all of them. first, all of the exterior walls, were constructed and they are going to be demolished and john did mention that there is some disagreement as to how much of the, and how much there is from the original building and how much is from the 2004 permit, and we, we agree that we don't want to leave and there is no inten