there is a prospect further on the right bank olga burlaeva sergeevich shchepyev, kherson region. today sergeioncern to organize round-the-clock work. during the inspection of the fulfillment of the state orders in tula region. we now turn out to be practically 24/7, yes, well, practically, yes , we work 20 hours every day creating modern radar systems. over the past 2 years , reconstruction of technical re-equipment of production capacity has increased significantly. and the effect of effective engineering solutions allowed not only to improve the quality of products, but also at the same time to reduce the time of its production. in particular , serial production of the latest models for reconnaissance of firing positions has already been mastered following the visit, the head of our military department held meeting at which he set the task of increasing the pace of production and repair of detection equipment used during the special operation. oh, on purpose, probably, the operation in ukraine is the most important. if not, the main role today is assigned to counter-battery warfare ; provid