SFGTV: San Francisco Government Television
40
40
Sep 29, 2022
09/22
by
SFGTV
tv
eye 40
favorite 0
quote 0
leading the sfpuc as general manager from 93-2000 and serving as a sfpuc commissioner 09 to 22. and where as began the career with sfpuc commission under mayor feinstein and conditioned to be a shepherd of the water system through 8 different san front mayors. and his unparalleled knowledge of urban water needs and agricultural water use he was invaluable who worked bring everyone together on important water issues. in his years of the sfpuc and founding member of the california urban water agencies he was instrumental in fostering cooperation among bay area water agencies and elevating the puc to a position of national utility leadership and outstanding contributions to the agency are too many to list among them his work to steer the region through the worse draught from 87 through 92. and did so with grace and skill. it was i challenging time and the drought was severe. his leadership reduced the affect on residence cents and the economy. used that drought experience to institutionalize air water conversation program that conditioned for 30 yours can'ting a per inship with com
leading the sfpuc as general manager from 93-2000 and serving as a sfpuc commissioner 09 to 22. and where as began the career with sfpuc commission under mayor feinstein and conditioned to be a shepherd of the water system through 8 different san front mayors. and his unparalleled knowledge of urban water needs and agricultural water use he was invaluable who worked bring everyone together on important water issues. in his years of the sfpuc and founding member of the california urban water...
SFGTV: San Francisco Government Television
45
45
Sep 11, 2022
09/22
by
SFGTV
tv
eye 45
favorite 0
quote 0
and thank you to the sfpuc for the opportunity to comment. so, the river and the delta watershed as we agree need cool, clean, flowing water to sustain the environment and ecosystem that all life including ours in the ecstasy depends on. so the sfpuc has a duty to balance both the needs for healthy watershed and the needs of the urban population. however, the current assumption that are included in the design drought make that balancing more difficult. so we just heard about the extraordinary uncertainty that is before us in the future. that's imperative to update those assumptions so we have the most productive exercise possible to really understand what will drive the outcome of the potentially really long drought. so, the impacts of climate change. predictive science is advancing daily. there is opportunity to update the impacts of in stroll flow requirements. adopted by the state water board and bay delta water quality control plan and many impacts on demands sensitivity. you know assumptions about future population growth. how people use
and thank you to the sfpuc for the opportunity to comment. so, the river and the delta watershed as we agree need cool, clean, flowing water to sustain the environment and ecosystem that all life including ours in the ecstasy depends on. so the sfpuc has a duty to balance both the needs for healthy watershed and the needs of the urban population. however, the current assumption that are included in the design drought make that balancing more difficult. so we just heard about the extraordinary...
at the physical meeting location listed above or may watch live online at https://www.sfgovtv.org/sfpuc
SFGTV: San Francisco Government Television
33
33
Sep 24, 2022
09/22
by
SFGTV
tv
eye 33
favorite 0
quote 0
howard fung with the sfpuc. i'm the interim director of wastewater capital program and the manager of the project management bureau. like to provide a quick introduction before i turn it over to the project manager carolyn choi. biosolid project is long in the making and identified as a need in our early master planning. the biosolid project is our largest capital improvement project and addresses the aging infrastructure at one of our most critical wastewater facilities. like many large and complex projects we have worked through a few challenges but happy to say we made study progress and in construction of those facilities. this project including the proposed cs235 amendment before you are budgeted and within the adopted 10 year capital financial plan. now, let me turn over to carolyn and she's been leading the project since the beginning to provide a bit more details. >> good afternoon. chair ronen, members of the committee. i'm carolyn chew with sfpuc project manager for biosolid project. so-next slide. her
howard fung with the sfpuc. i'm the interim director of wastewater capital program and the manager of the project management bureau. like to provide a quick introduction before i turn it over to the project manager carolyn choi. biosolid project is long in the making and identified as a need in our early master planning. the biosolid project is our largest capital improvement project and addresses the aging infrastructure at one of our most critical wastewater facilities. like many large and...
SFGTV: San Francisco Government Television
54
54
Sep 14, 2022
09/22
by
SFGTV
tv
eye 54
favorite 0
quote 0
. >> a hi, i'm karen fry a project manager and sfpuc and the bureau of environmental management honestly i've not considered a public sector job i realized this was an opportunity to work on large capital projects from san francisco all the way to our hetch hetchy and the yosemite national park i work with engineers and city attorneys and scheduled and we all work tom nolan e together on the project. >> the excavations are in red we'll have the interference to go under the street. >> my next project is the largest project in the water system improvement program this is the southeast plan that involved a lot of kworpthsdz with the community groups and public when 9 commissioners such the planning commission and the board of supervisors or this ftc commission they help us in city hall this is a beautiful building it really is the inner workers of the building you feel you're in the heart of government and it's exciting to be part of that >> >> evening, the regular board -- good
. >> a hi, i'm karen fry a project manager and sfpuc and the bureau of environmental management honestly i've not considered a public sector job i realized this was an opportunity to work on large capital projects from san francisco all the way to our hetch hetchy and the yosemite national park i work with engineers and city attorneys and scheduled and we all work tom nolan e together on the project. >> the excavations are in red we'll have the interference to go under the street....
SFGTV: San Francisco Government Television
49
49
Sep 6, 2022
09/22
by
SFGTV
tv
eye 49
favorite 0
quote 0
i believe representative from thes sfpuc are on the line, thank you. >> thank you, mr. kenny. i understand supervisor peskin is in the room. and i wish to recognize him and if you wish to speak. >> chair lee, members of the ethic's commission, the executive director and staff i'm aaron peskin, supervisor and author of the legislation that is before you, which as staff indicated responds to the vast majority of the issues that staff has raised and staff has pointed out the 2 places where there is still a slight difference. happy to visit with you about those. but we have had a collaboration with my office, mayor's office, which is joined by hank heckle remotely this morning. and your staff and to that end, we went from the 2 competing versions to the combined version and now you have the combined revised version that addresses the various amendments and points of contention in large part if not almost fully, i also would like to raise for your consideration some suggestions from counsel that -- that is that mr. bush? commissioner bush? i will proceed. >> i'm error. i'm sorry i
i believe representative from thes sfpuc are on the line, thank you. >> thank you, mr. kenny. i understand supervisor peskin is in the room. and i wish to recognize him and if you wish to speak. >> chair lee, members of the ethic's commission, the executive director and staff i'm aaron peskin, supervisor and author of the legislation that is before you, which as staff indicated responds to the vast majority of the issues that staff has raised and staff has pointed out the 2 places...
SFGTV: San Francisco Government Television
51
51
Sep 28, 2022
09/22
by
SFGTV
tv
eye 51
favorite 0
quote 0
it is known as sfpuc parcel 57. it is denoted here with these upon ma genta lines here. prosecute poses to replace the al modea creek bridge to correct deficiencies. and realign the props to the combrij to do so it seeks to require 2 feet parcels totalling 22,000 square feet. and 2 easement parcels totalling 34,000 upon square feet. next slide, please. is it possible to see my cursor this next one depicts the nltz 4 parcels conveyed -- the small parcel in the upper left is the parcel to be permanent followed boyfriend this long one he were and, thank you. that's a fee parcel. the other 2 parcels are temporary construction easement parcels conveyed temporarily for construction purposes. has no utility use for this property. deemed underutilize in the the statement dated may 18 of 21. signed by all 3 assistant general managers of the puc water earnprize. wastewater and power. cal trans made a government code offer. and staff appraised the fair market value as of april of 21 roughly 25 thousand dollars. the city's director of property approved this aappraisal in june of 21.
it is known as sfpuc parcel 57. it is denoted here with these upon ma genta lines here. prosecute poses to replace the al modea creek bridge to correct deficiencies. and realign the props to the combrij to do so it seeks to require 2 feet parcels totalling 22,000 square feet. and 2 easement parcels totalling 34,000 upon square feet. next slide, please. is it possible to see my cursor this next one depicts the nltz 4 parcels conveyed -- the small parcel in the upper left is the parcel to be...
SFGTV: San Francisco Government Television
59
59
Sep 5, 2022
09/22
by
SFGTV
tv
eye 59
favorite 0
quote 0
working on an audit of the city's landfill dispole agreement part of public integrity work and the sfpuc commission contracting process assessment. that is what we have going in terms of public integrity reports. >> great. thanks for this. mark. i will take the next item. which is the public perception survey. this suspect the surveys we do to find out what park users value about park redesign. we have completed data collection at both willie wong play grounds and the stanion street edge we have done 900 surveys at each location. for the will wong play grounds the office received that data which has been used to develop a follow up suri have for a subset and that out reach started last week. stanion street sampling will go through the same press we expect this data in the next week or 2. the plan is to present the report findings at the december 12 hearing of this group. i will turn it back to mark for the next item on work plan update. >> yes. on our csa work plan update, i am working closely with my division with -- natasha division to complete our f yshg 22/23 work plan in terms of th
working on an audit of the city's landfill dispole agreement part of public integrity work and the sfpuc commission contracting process assessment. that is what we have going in terms of public integrity reports. >> great. thanks for this. mark. i will take the next item. which is the public perception survey. this suspect the surveys we do to find out what park users value about park redesign. we have completed data collection at both willie wong play grounds and the stanion street edge...
SFGTV: San Francisco Government Television
47
47
Sep 18, 2022
09/22
by
SFGTV
tv
eye 47
favorite 0
quote 0
we are look to partner with sfpuc to include the storm water management necessary as we raise the coastal defense. bart is also a partner on this project. and we need to consider the deteriorated conditions and investments. i note this project we think is an excellent project for a fema brick opportunity and looking at potentially submit thanksgiving in this go around. the project is a long stretch. and the zone from pearce 5 through 1 there is more time. the zone around the ferry building we think we need to cocoordinate with the seismic project we will not have 2 construction projects we are having one project here. and zone 3 just south of the ferry building ag building is the most at risk that may be our first priority. and the pier 24 and a half to 28 and a half wall and wharf safety retrofit project this is 900 foot stretch of wharfs and pearce a tall wall. wall and wharf support much of the prom in the there are better soils here and lower quake lateral spreading hazzard which is good. about you there are high quake risks due to the structure vulnerabilities in the tall wall. flood
we are look to partner with sfpuc to include the storm water management necessary as we raise the coastal defense. bart is also a partner on this project. and we need to consider the deteriorated conditions and investments. i note this project we think is an excellent project for a fema brick opportunity and looking at potentially submit thanksgiving in this go around. the project is a long stretch. and the zone from pearce 5 through 1 there is more time. the zone around the ferry building we...
SFGTV: San Francisco Government Television
41
41
Sep 30, 2022
09/22
by
SFGTV
tv
eye 41
favorite 0
quote 0
. >> good afternoon like to call the september 27, 2022 meeting of sfpuc to order.ll. >> president moran. >> here >> commissioner maxwell and commissioner paulson is excused today. >> um -- this meeting it held in person room
. >> good afternoon like to call the september 27, 2022 meeting of sfpuc to order.ll. >> president moran. >> here >> commissioner maxwell and commissioner paulson is excused today. >> um -- this meeting it held in person room
SFGTV: San Francisco Government Television
23
23
Sep 21, 2022
09/22
by
SFGTV
tv
eye 23
favorite 0
quote 0
at the physical meeting location listed above or may watch live online at https://www.sfgovtv.org/sfpuc instructions for providing remote public comment are below public comment call-in: 1 (415) 655-0001 / meeting id: 2495 057 6064 # # >> thank you, before i start, i would like to recognize the -- lands before the public utilities commission findings and recognize the tribal land and the tribe, have established a working partnership with sf puc and within the many greater san francisco area today. >> please call the first item. >> >>clerk: 3. adopt renewed findings under state urgency legislation to allow hybrid in-person meetings during the covid-19 emergency and direct the commission secretary to agendize a similar resolution at a commission meeting within the next 30 days. >> thank you. >> will you please open public comments? >> are there any public members to provide public comment? we have one public caller. >> that is line 3. >> public caller, i have opened your line. do you wish to provide public comment to item no. 3? >> no response. >> thank you. >> item no. 3 public comment i
at the physical meeting location listed above or may watch live online at https://www.sfgovtv.org/sfpuc instructions for providing remote public comment are below public comment call-in: 1 (415) 655-0001 / meeting id: 2495 057 6064 # # >> thank you, before i start, i would like to recognize the -- lands before the public utilities commission findings and recognize the tribal land and the tribe, have established a working partnership with sf puc and within the many greater san francisco...
SFGTV: San Francisco Government Television
55
55
Sep 15, 2022
09/22
by
SFGTV
tv
eye 55
favorite 0
quote 0
how can you tolerate a department like the sfpuc starting a project with 6 billion now nearing 12 billion and headed for 20 billion? i will googly with the grand jury saying something. the grand jury says a lot. but in the ends it asks the department heads to come up with a solution. where is enforcement? that's what i'm asking. go to the mayor, go to the controller's office. go to the city attorney. and ask them who is going to do the enforcement? do not waste taxpayer money. san francisco are arc constitute and watching y'all like a hawk. thank you very much. >> thank you mr. decosta for your comments. do we have other, yes. come forward. >> i had a question. i heard everything here. i still in the sure who owns the data base or application running on the data base public ws or contractor? the i heard a tech department that has to coordinate this. if it is them why are they not hear, thank you? >> thank you. this is not a question and answer time it is our time to hear from the public. but we will go ahead and go to the next commenter. we have no other in person. we gallon to the public
how can you tolerate a department like the sfpuc starting a project with 6 billion now nearing 12 billion and headed for 20 billion? i will googly with the grand jury saying something. the grand jury says a lot. but in the ends it asks the department heads to come up with a solution. where is enforcement? that's what i'm asking. go to the mayor, go to the controller's office. go to the city attorney. and ask them who is going to do the enforcement? do not waste taxpayer money. san francisco are...
SFGTV: San Francisco Government Television
39
39
Sep 7, 2022
09/22
by
SFGTV
tv
eye 39
favorite 0
quote 0
finding the satisfaction of seeing the project come into fruition i've also take advantage of the sfpucining program yunt my certification i see the flow from the pipeline into the tunnel one by one and i also had several opportunities to attend and make presentations at conferences also as a tape recording san francisco resident authenticity rewarding to know the work i do contribute to the quality of life my life and those around me >> sfgovtv, ready to begin. good morning today is wednesday, august 17th, 2022. this is the building inspection commission. i would like to reminds you mute yourself if you are not speak. the first item is roll call president bito. >> here. vice president tam. >> here. >> commissioner alexander. >> hee. >> commissioner sommer. >> we have a kwoer update, commissioners eppler and neuman are excused. next we have our lands acknowledgment. thank you. ramaytush ohlone land acknowledgement the building inspection commission acknowledges that we are on the unceded ancestral homeland of the ramaytush ohlone, who are the original inhabitants of the san francisco pe
finding the satisfaction of seeing the project come into fruition i've also take advantage of the sfpucining program yunt my certification i see the flow from the pipeline into the tunnel one by one and i also had several opportunities to attend and make presentations at conferences also as a tape recording san francisco resident authenticity rewarding to know the work i do contribute to the quality of life my life and those around me >> sfgovtv, ready to begin. good morning today is...
at the physical meeting location listed above or may watch live online at https://www.sfgovtv.org/sfpuc
SFGTV: San Francisco Government Television
35
35
Sep 29, 2022
09/22
by
SFGTV
tv
eye 35
favorite 0
quote 0
. [♪♪♪] >> good afternoon like to call the september 27, 2022 meeting of sfpuc to order.the roll. >> president moran. >> here >> commissioner maxwell and commissioner paulson is excused today. >> um --
. [♪♪♪] >> good afternoon like to call the september 27, 2022 meeting of sfpuc to order.the roll. >> president moran. >> here >> commissioner maxwell and commissioner paulson is excused today. >> um --