shakku, represented in the world by our institute, is about 100 years old.ented in 13 countries in the field of consulting and design of hydraulic engineering in mining hydropower and other areas. rushydra implements large investment projects, as noted by general director viktor khmarin, including in difficult climatic conditions. we are talking about chakotka, where a 110 kv power transmission line was put into operation. new line. 490 km long connected the northernmost city of russia pevek and the city of belibina, among the significant projects are the new block of the vladivostok tets-2, as well as the krasnogorsk small gs1 in karachay-cherkessia. in 2023, investments in rushydra projects exceeded 220 billion rubles, with plans to increase the figures significantly. if talking about investment plans until the twenty- eighth year is more than 800 billion rubles, of which more than 70% will be developed in the far east. we plan to introduce about 2.5 gv of electrical capacity. we plan to build more than 500 km of power lines; in the future, two new hydroel