acceleration in a big project for gas supply to the city of shovalabad and 38 heads of the route. scope of the implementation of this project is 157 km of polyethylene and metal network along with the installation of 3 pressure reduction stations. currently, this vital plan has a physical opening and is about to be put into operation. one of the significant points of this project. the execution operations of more than 80 routes were in completely rocky and impassable lands, which due to the vegetation of the area and the fact that we always try to ensure that the execution route of the lines is on the routes with minimal vegetation and to use the old vision routes that this action which was an important action in order to protect the environment , it caused our total price in this project to increase to some extent. a plan that, in addition to preventing the destruction of forests , has now made the people of these areas happy. before gas came to chuob , we used it for 10 years and 15 years with oil. don't worry sooner. currently , nearly 10 billion tomans have been spent on the i