. >> this is the pier 9 south apron. funding and construction of this project were all done entirely in house by port staff. port maintenance is working on a similar larger project to repair the timber apron at pier 92. port and development partnered with the port for the pier pier 70 and completed construction on most of the buildings. as you know, this is more than restoreing once major buildings. this are unstates to fire safety, energy efficiency and square footage. port engineering performed design and construction management for the pier 31 roof and structural repair project. this building as you can see from the shoring installed was on the verge of collapse, and after a major effort by the project team the structure is repaired and the new roofing will preserve the work completed. again, this is a sample of some of the structural repair projects that resulted in upgrade to the facility rating. i will review the typical damage in the red and yellow tagged facilities focusing on the marine structures. as you can im