of exploitation west of karun, arundan oil and gas company is located in the west of karun in south azadegan, the only existing factory that processes oil, now it is a very strategic sugar factory that is being prepared with major repairs to produce oil in the shield and front fields. receive and to the purpose is to receive sepehr's alimony, which increases the capacity of this 35-day program, which started on the 44th. major repairs to repair the damaged spinal cord . calibration of the minia valves is a difficult and difficult task in the heat of august in ahvaz, which is in the shade of temperature and 50 the degree goes up and going inside the wind tank, going from these towers at a height of 20 meters and doing basic repairs is a very exhausting job. after half an hour, we have to go outside and get some fresh air. then you won't notice if the heat and dirt that rises up from inside the bladder is inside. remote scheduling in common fields from competing with neighboring countries let's not fall behind in oil extraction. let's consider 50 thousand problems for 20 days . we should have