so, this was a coordinated erftd between public work squz mta. public works did land surveys for the segment jz took lead on f and g. mta took leads on m, n and o. i will woke through f and g and probably familiar with it but good to get a picture of what the issues are. there is a plan view on the left side that shows segments f and g where cesar chavez meets the 101 onramp and pictures on the right hand side basically move east as you move towards the highway overpass. that first picture on the top right is where the bike pass comes off cesar chavez and on the sidewalk and bike ped path moves towards under the highway. the second picture is a further down the path and third picture is where the path moves under the overpass and see the clearance issue. so, key issues and constraints for f and g, the western entrance driveway is narrow and in bad condition. the clearance is not sufficient at the overpass. the lighting isn't sufficient and needs repair and there are drainage issues with the entire set of segments. this is a plan view of those exis
so, this was a coordinated erftd between public work squz mta. public works did land surveys for the segment jz took lead on f and g. mta took leads on m, n and o. i will woke through f and g and probably familiar with it but good to get a picture of what the issues are. there is a plan view on the left side that shows segments f and g where cesar chavez meets the 101 onramp and pictures on the right hand side basically move east as you move towards the highway overpass. that first picture on...
SFGTV: San Francisco Government Television
105
105
Nov 19, 2016
11/16
by
SFGTV
tv
eye 105
favorite 0
quote 0
so, this was a coordinated erftd between public work squz mta. public works did land surveys for the segment jz took lead on f and g. mta took leads on m, n and o. i will woke through f and g and probably familiar with it but good to get a picture of what the issues are. there is a plan view on the left side that shows segments f and g where cesar chavez meets the 101 onramp and pictures on the right hand side basically move east as you move towards the highway overpass. that first picture on the top right is where the bike pass comes off cesar chavez and on the sidewalk and bike ped path moves towards under the highway. the second picture is a further down the path and third picture is where the path moves under the overpass and see the clearance issue. so, key issues and constraints for f and g, the western entrance driveway is narrow and in bad condition. the clearance is not sufficient at the overpass. the lighting isn't sufficient and needs repair and there are drainage issues with the entire set of segments. this is a plan view of those exis
so, this was a coordinated erftd between public work squz mta. public works did land surveys for the segment jz took lead on f and g. mta took leads on m, n and o. i will woke through f and g and probably familiar with it but good to get a picture of what the issues are. there is a plan view on the left side that shows segments f and g where cesar chavez meets the 101 onramp and pictures on the right hand side basically move east as you move towards the highway overpass. that first picture on...
SFGTV: San Francisco Government Television
114
114
Nov 26, 2016
11/16
by
SFGTV
tv
eye 114
favorite 0
quote 0
so, this was a coordinated erftd between public work squz mta. and surveys for the segment jz took lead on f and g. mta took leads on m, n and o. i will woke through f and g and probably familiar with it but good to get a picture of what the issues are. there is a plan view on the left side that shows segments f and g where cesar chavez meets the 101 onramp and pictures on the right hand side basically move east as you move towards the highway overpass. that first picture on the top right is where the bike pass comes off cesar chavez and on the sidewalk and bike ped path moves towards under the highway. the second picture is a further down the path and third picture is where the path moves under the overpass and see the clearance issue. so, key issues and constraints for f and g, the western entrance driveway is narrow and in bad condition. the clearance is not sufficient at the overpass. the lighting isn't sufficient and needs repair and there are drainage issues with the entire set of segments. this is a plan view of those existing conditions. a
so, this was a coordinated erftd between public work squz mta. and surveys for the segment jz took lead on f and g. mta took leads on m, n and o. i will woke through f and g and probably familiar with it but good to get a picture of what the issues are. there is a plan view on the left side that shows segments f and g where cesar chavez meets the 101 onramp and pictures on the right hand side basically move east as you move towards the highway overpass. that first picture on the top right is...
SFGTV: San Francisco Government Television
68
68
Nov 30, 2016
11/16
by
SFGTV
tv
eye 68
favorite 0
quote 0
so, this was a coordinated erftd between public work squz mta. public works did land surveys for the segment jz took lead on f and g. mta took leads on m, n and o. i will woke through f and g and probably familiar with it but good to get a picture of what the issues are. there is a plan view on the left side that shows segments f and g where cesar chavez meets the 101 onramp and pictures on the right hand side basically move east as you move towards the highway overpass. that first picture on the top right is where the bike pass comes off cesar chavez and on the sidewalk and bike ped path moves towards under the highway. the second picture is a further down the path and third picture is where the path moves under the overpass and see the clearance issue. so, key issues and constraints for f and g, the western entrance driveway is narrow and in bad condition. the clearance is not sufficient at the overpass. the lighting isn't sufficient and needs repair and there are drainage issues with the entire set of segments. this is a plan view of those exis
so, this was a coordinated erftd between public work squz mta. public works did land surveys for the segment jz took lead on f and g. mta took leads on m, n and o. i will woke through f and g and probably familiar with it but good to get a picture of what the issues are. there is a plan view on the left side that shows segments f and g where cesar chavez meets the 101 onramp and pictures on the right hand side basically move east as you move towards the highway overpass. that first picture on...
SFGTV: San Francisco Government Television
44
44
Nov 25, 2016
11/16
by
SFGTV
tv
eye 44
favorite 0
quote 0
so, this was a coordinated erftd between public work squz mta. public works did land surveys for the segment jz took lead on f and g. mta took leads on m, n and o. i will woke through f and g and probably familiar with it but good to get a picture of what the issues are. there is a plan view on the left side that shows segments f and g where cesar chavez meets the 101 onramp and pictures on the right hand side basically move east as you move towards the highway overpass. that first picture on the top right is where the bike pass comes off cesar chavez and on the sidewalk and bike ped path moves towards under the highway. the second picture is a further down the path and third picture is where the path moves under the overpass and see the clearance issue. so, key issues and constraints for f and g, the western entrance driveway is narrow and in bad condition. the clearance is not sufficient at the overpass. the lighting isn't sufficient and needs repair and there are drainage issues with the entire set of segments. this is a plan view of those exis
so, this was a coordinated erftd between public work squz mta. public works did land surveys for the segment jz took lead on f and g. mta took leads on m, n and o. i will woke through f and g and probably familiar with it but good to get a picture of what the issues are. there is a plan view on the left side that shows segments f and g where cesar chavez meets the 101 onramp and pictures on the right hand side basically move east as you move towards the highway overpass. that first picture on...
SFGTV: San Francisco Government Television
91
91
Nov 16, 2016
11/16
by
SFGTV
tv
eye 91
favorite 0
quote 0
so, this was a coordinated erftd between public work squz mta. public works did land surveys for the segment jz took lead on f and g. mta took leads on m, n and o. i will woke through f and g and probably familiar with it but good to get a picture of what the issues are. there is a plan view on the left side that shows segments f and g where cesar chavez meets the 101 onramp and pictures on the right hand side basically move east as you move towards the highway overpass. that first picture on the top right is where the bike pass comes off cesar chavez and on the sidewalk and bike ped path moves towards under the highway. the second picture is a further down the path and third picture is where the path moves under the overpass and see the clearance issue. so, key issues and constraints for f and g, the western entrance driveway is narrow and in bad condition. the clearance is not sufficient at the overpass. the lighting isn't sufficient and needs repair and there are drainage issues with the entire set of segments. this is a plan view of those exis
so, this was a coordinated erftd between public work squz mta. public works did land surveys for the segment jz took lead on f and g. mta took leads on m, n and o. i will woke through f and g and probably familiar with it but good to get a picture of what the issues are. there is a plan view on the left side that shows segments f and g where cesar chavez meets the 101 onramp and pictures on the right hand side basically move east as you move towards the highway overpass. that first picture on...
SFGTV: San Francisco Government Television
58
58
Nov 24, 2016
11/16
by
SFGTV
tv
eye 58
favorite 0
quote 0
so, this was a coordinated erftd between public work squz mta. blic works did land surveys for the segment jz took lead on f and g. mta took leads on m, n and o. i will woke through f and g and probably familiar with it but good to get a picture of what the issues are. there is a plan view on the left side that shows segments f and g where cesar chavez meets the 101 onramp and pictures on the right hand side basically move east as you move towards the highway overpass. that first picture on the top right is where the bike pass comes off cesar chavez and on the sidewalk and bike ped path moves towards under the highway. the second picture is a further down the path and third picture is where the path moves under the overpass and see the clearance issue. so, key issues and constraints for f and g, the western entrance driveway is narrow and in bad condition. the clearance is not sufficient at the overpass. the lighting isn't sufficient and needs repair and there are drainage issues with the entire set of segments. this is a plan view of those existi
so, this was a coordinated erftd between public work squz mta. blic works did land surveys for the segment jz took lead on f and g. mta took leads on m, n and o. i will woke through f and g and probably familiar with it but good to get a picture of what the issues are. there is a plan view on the left side that shows segments f and g where cesar chavez meets the 101 onramp and pictures on the right hand side basically move east as you move towards the highway overpass. that first picture on the...
SFGTV: San Francisco Government Television
62
62
Nov 24, 2016
11/16
by
SFGTV
tv
eye 62
favorite 0
quote 0
so, this was a coordinated erftd between public work squz mta. public works did land surveys for the segment jz took lead on f and g. mta took leads on m, n and o. i will woke through f and g and probably familiar with it but good to get a picture of what the issues are. there is a plan view on the left side that shows segments f and g where cesar chavez meets the 101 onramp and pictures on the right hand side basically move east as you move towards the highway overpass. that first picture on the top right is where the bike pass comes off cesar chavez and on the sidewalk and bike ped path moves towards under the highway. the second picture is a further down the path and third picture is where the path moves under the overpass and see the clearance issue. so, key issues and constraints for f and g, the western entrance driveway is narrow and in bad condition. the clearance is not sufficient at the overpass. the lighting isn't sufficient and needs repair and there are drainage issues with the entire set of segments. this is a plan view of those exis
so, this was a coordinated erftd between public work squz mta. public works did land surveys for the segment jz took lead on f and g. mta took leads on m, n and o. i will woke through f and g and probably familiar with it but good to get a picture of what the issues are. there is a plan view on the left side that shows segments f and g where cesar chavez meets the 101 onramp and pictures on the right hand side basically move east as you move towards the highway overpass. that first picture on...
SFGTV: San Francisco Government Television
68
68
Nov 15, 2016
11/16
by
SFGTV
tv
eye 68
favorite 0
quote 0
>> that is in mta plan and because it is close to thumount needed for mn and o and ready to start moving on those segments we started the process move frgward with those segment squz looking for funding for segments f and g. >> my question is, i understand it is probably easier to go with mn and o because the funding matches the amount orphmoney from mta, but i'm unable to determine which is high priority. which of the two segments is higher priority than the other? >> they have relatively equal prioritys. mn and o that funding is coming out of mta, cit budget and it is road work so it makes sense to use that funding for improvements that we are able to manage. segments f and g are strithly for the bike and pedestrian path and less on the roadway so we are working with dpw to really look for funding for those segments. at this point segments mn and o are mta led project so use said mta funds- >> supervisor campos. >> thank you, commissioner cohen. what is the completion date for both segments? >> i will flip to the next slide. segment frz mn and o because we have the funding in place we have started that process. we are going to be finishing up preliminary enginee
>> that is in mta plan and because it is close to thumount needed for mn and o and ready to start moving on those segments we started the process move frgward with those segment squz looking for funding for segments f and g. >> my question is, i understand it is probably easier to go with mn and o because the funding matches the amount orphmoney from mta, but i'm unable to determine which is high priority. which of the two segments is higher priority than the other? >> they...
SFGTV: San Francisco Government Television
74
74
Nov 7, 2016
11/16
by
SFGTV
tv
eye 74
favorite 0
quote 0
department will ask sfpd and mta to do double parking enforcement because that is a hazard when a double park vehicle causes a traffic jam mpt i look forward to the conversation squz today we want to preserve the status quo so we can have the conversations. >> agreed and thank you for the comments. at the sake of not gelting in a debate i like to follow up one thing on that. the street width for access and traffic calming devices are not necessarily the same. there is overlap and for the status quo if we work and maintain what we are doing on case by case that applies to trafic calming as well which is for future discussion. i will move on. >> thank you. >> as you know, every 3 yearicize a new cycle. we repeal the current code and adopt the new code and the adoption process we basically for the most part roll oever the majority of the existing code into the new code with minor chairchgs changes. we have 14 or 15 additions which i'll high lited today and speak to any questions you may have. >> if i may >> supervisor peskin. >> at base it seems we have two conflicting safety policy issues that are the subject of these amendments. on the one hand, as supervisor wiene
department will ask sfpd and mta to do double parking enforcement because that is a hazard when a double park vehicle causes a traffic jam mpt i look forward to the conversation squz today we want to preserve the status quo so we can have the conversations. >> agreed and thank you for the comments. at the sake of not gelting in a debate i like to follow up one thing on that. the street width for access and traffic calming devices are not necessarily the same. there is overlap and for the...
SFGTV: San Francisco Government Television
52
52
Nov 4, 2016
11/16
by
SFGTV
tv
eye 52
favorite 0
quote 0
department will ask sfpd and mta to do double parking enforcement because that is a hazard when a double park vehicle causes a traffic jam mpt i look forward to the conversation squz today we want to preserve the status quo so we can have the conversations. >> agreed and thank you for the comments. at the sake of not gelting in a debate i like to follow up one thing on that. the street width for access and traffic calming devices are not necessarily the same. there is overlap and for the status quo if we work and maintain what we are doing on case by case that applies to trafic calming as well which is for future discussion. i will move on. >> thank you. >> as you know, every 3 yearicize a new cycle. we repeal the current code and adopt the new code and the adoption process we basically for the most part roll oever the majority of the existing code into the new code with minor chairchgs changes. we have 14 or 15 additions which i'll high lited today and speak to any questions you may have. >> if i may >> supervisor peskin. >> at base it seems we have two conflicting safety policy issues that are the subject of these amendments. on the one hand, as supervisor wiene
department will ask sfpd and mta to do double parking enforcement because that is a hazard when a double park vehicle causes a traffic jam mpt i look forward to the conversation squz today we want to preserve the status quo so we can have the conversations. >> agreed and thank you for the comments. at the sake of not gelting in a debate i like to follow up one thing on that. the street width for access and traffic calming devices are not necessarily the same. there is overlap and for the...
SFGTV: San Francisco Government Television
349
349
Nov 2, 2016
11/16
by
SFGTV
tv
eye 349
favorite 0
quote 0
department will ask sfpd and mta to do double parking enforcement because that is a hazard when a double park vehicle causes a traffic jam mpt i look forward to the conversation squzay we want to preserve the status quo so we can have the conversations. >> agreed and thank you for the comments. at the sake of not gelting in a debate i like to follow up one thing on that. the street width for access and traffic calming devices are not necessarily the same. there is overlap and for the status quo if we work and maintain what we are doing on case by case that applies to trafic calming as well which is for future discussion. i will move on. >> thank you. >> as you know, every 3 yearicize a new cycle. we repeal the current code and adopt the new code and the adoption process we basically for the most part roll oever the majority of the existing code into the new code with minor chairchgs changes. we have 14 or 15 additions which i'll high lited today and speak to any questions you may have. >> if i may >> supervisor peskin. >> at base it seems we have two conflicting safety policy issues that are the subject of these amendments. on the one hand, as supervisor wiener sa
department will ask sfpd and mta to do double parking enforcement because that is a hazard when a double park vehicle causes a traffic jam mpt i look forward to the conversation squzay we want to preserve the status quo so we can have the conversations. >> agreed and thank you for the comments. at the sake of not gelting in a debate i like to follow up one thing on that. the street width for access and traffic calming devices are not necessarily the same. there is overlap and for the...
SFGTV: San Francisco Government Television
109
109
Nov 21, 2016
11/16
by
SFGTV
tv
eye 109
favorite 0
quote 0
department will ask sfpd and mta to do double parking enforcement because that is a hazard when a double park vehicle causes a traffic jam mpt i look forward to the conversation squz today we want to preserve the status quo so we can have the conversations. >> agreed and thank you for the comments. at the sake of not gelting in a debate i like to follow up one thing on that. the street width for access and traffic calming devices are not necessarily the same. there is overlap and for the status quo if we work and maintain what we are doing on case by case that applies to trafic calming as well which is for future discussion. i will move on. >> thank you. >> as you know, every 3 yearicize a new cycle. we repeal the current code and adopt the new code and the adoption process we basically for the most part roll oever the majority of the existing code into the new code with minor chairchgs changes. we have 14 or 15 additions which i'll high lited today and speak to any questions you may have. >> if i may >> supervisor peskin. >> at base it seems we have two conflicting safety policy issues that are the subject of these amendments. on the one hand, as supervisor wiene
department will ask sfpd and mta to do double parking enforcement because that is a hazard when a double park vehicle causes a traffic jam mpt i look forward to the conversation squz today we want to preserve the status quo so we can have the conversations. >> agreed and thank you for the comments. at the sake of not gelting in a debate i like to follow up one thing on that. the street width for access and traffic calming devices are not necessarily the same. there is overlap and for the...