. >> let's have a roll call /sroegs vote for in motion. >> chew, i, cohen i, /tpaeurl i tang i, commissioner wiener, i. commissioner which you's motion passes. >> thank you. are there any other items? >> item number nine, recommend the reward of a three year contract in the university of maryland [inaudible] case study [inaudible] terms and non material contract terms and conditions. this is an action item. >> thank you. >> i'm robert traytive engineer with the [inaudible] on page 111 of your packet. as you know the transportation authority has served as coupon so are with the california department of transportation for the presidio parkway project. project is being built in two phases -- the phase one contract which substantial lyly we are organizing it around six key objects [inaudible] and maintenance of the [inaudible] identify the factors that determine the effect /t*euness of each method, identify and analyze advantages of each method, reach a con /khaougs as to which method reached better results in this project and best method /tp-f for future projects. academic institutions only we