there was a transition of numbers in the stafft says 45.be clear we're talk ing about closure of pier as a background assess ment report completed moffin and the peer designatedre were no plans for repairs. the monitored. for this reason we entering into new leases at the location. a new rsan jan of 2023 by ryantructure design sections of the pier as red. port engineering had on going safety of anyone no plans to repair rec closure with. this we are looking at complete closure. looking to do work going forward. so it wil remain closed. the closureec total 11 ten ants. many who have been with the port for a decad leases are month to month. can be wh 30-days written notice. the port required to pay relocations costs. the pier is not being closed for a development project. due to dilapidated condition of the pier rents relative to other locations and substantially lesurrent parameter for similar size space. for tenants looking to relocate this will create a port staff is proposing a rentalst program. delaying rent increases allowing the higher