directly connects the southern direction of the moscow high-speed diameter with lyublinskaya, stavropolskayaaya streets, the new section of the road will relieve volgogradsky prospekt and volzhsky boulevard, and lyublinskaya itself, experts say, will become 11% freer. this project will unite two areas of the district, these are the printers and lyublino, will allow people from the printers to quickly get to lyubleno, on the contrary, from lyubleno they will quickly move to the printers, bypassing volgogradsky prospekt. during the 3 years of construction of the interchange , four ramps were erected, kilometers of utility lines were rebuilt, and the adjacent road network was reconstructed. the railway is a difficulty that had to be faced during construction. all work had to be carried out through the tracks, for a strictly limited time, so to speak. windows, and the structure itself was mounted using a giant crane weighing more than 700 tons. for many, many years, moving was carried out under the railway in one car, with pendulum movement back and forth, which, of course, was inconvenient and