tabatabi, i read that everything is correct, but if there are 30 indicators, it cannot be evaluated at all. as a rule , different devices have different indicators. these should be separated from each other. four, five are general, five are specialized, and it should be known which evaluators are the ones who want to evaluate. what are the evaluation tools? it should be known, after all, the tools include psychological tests. there is a system to suppose that someone wants to be a minister and be able to manage a crisis in the country . for example, something happened in a certain power plant, what do you want to do now so that it can manage and respond, and those people who are there, we actually have 10, 12 indicators, 56, in fact, we have evaluators, and we have four or five evaluation tools, for example. it is possible to remove them from this situation if we want to do this model, if it is not a scientific model, the political model is in the hands of the president, it is in the hands of his team, and no one can take away the president with any model , with any tool, i said, the p