owner took over, attempted to locate a contractor who would touch the building which isn't a easy tarfck, obtained a permit in mid-march before [inaudible] issued the emergency vacate order. the permit was issued in mid-march and relocation issued in early april. by the end of march the owner noticed the tenants to relocate for repair squz the tenants responded by filing a lawsuit which they are entitled to do but complicated matters for the owner to move forward. april third, the department issued the order and further notice of evaluation shortly there after which begins or efforts and mr. nob efforts at getting the building fixed. may 8 the department issued further correction notice so it is something of a moving target for this propt owner to try to figure out what needs to be done and get permits for fixing them. i think in the grand scheme of things and how long these issued persisted is a short period of time. i realize 5 or 6 months isn't a short period of time but if you look at the record on the property you see a complaint issued in 1994 for walls and ceiling surfaces that ar