for more details, visit tehran water control center, we will go and talk with director general of waterfai company of tehran province, mr. ardakani, greetings to you, since last night until now , the problem of drinking water in the neighborhoods has been solved. due to the rain and the fall of thousands of tons of huge rocks on the water flow path from amirkabir dam to the cities of tehran and karaj, after three years of the operation of this dam, the water flow was blocked for the first time towards the cities of tehran and karaj from our side. we used to supply 20% of tehran's water from sadr of course, if this issue was not managed, problems would have occurred in about 20% of the city of tehran with very technical and expert measures . the experts reopened the route, and subsequently, with the measures that were taken, these large dimensions were reduced by approximately 20% to about 4 in the water fluctuations in the city, and with this , we reduced this amount, which we transferred to a related point. to different places happy now the flow of water from amirkabir dam to the houses of tehran is completely esta