additionally, the existing gym florez bill with two and one- quarter inch wide floorboards. the standard is for a narrow, one and one-half inch floorboard. this is the most dimensionally stable floorboard around, and it is less likely to cup or warp during the cold weather and the wet season. commissioners, as a result of these findings, we recommend that the scope of this deferred maintenance project be amended for the following vietor to waterproof the pavilion building foundation, install paid training system along the pavilion's south perimeter, exterior. it drains into a new 10-inch pan drain line peter replace a 10- foot section of the existing drain line leading up to frederick street. repave the south perimeter what way and pave over the foundation planting strip for water in permeability, for water that would come down off the building exterior. reform the concrete steps. reroof the south roof section to replace the better system. once that work is done, on the the gym floor, replace it with a permaflex system, including a vapor there your installation. that floor sy