i feel thmodernization is a solution, a possibility. we heard from the contractor saying he's unsure what components need to be replaced, or how, and what type of waivers can be obtained so that they can fix the elevator. so in the interim, i appreciate that the owner is trying to speak to a tenant about mitigation matters. and maybe ask that the department, give us an update of the process in maybe 6-9 months time. >> commissioner lee, i kind of concur with the direction you're going. i mean, it's pick your poison. it's one of these situations where once again to commissioner lee's point, everybody's heart is in the right place, trying to do the right thing here, i think it's very compelling that the tenants are involved in this decision. i'm cognizant of the costs being added onto the tenants' bottom line. i'm kind of leaning towards if we could give more time based on everybody's involvement here with the caveat, this is probably inspected every month and make sure it's levelled and due diligence is done to make sure that continues.