threec, an update -- 3c, an update on permit drafting systems. >> yes, it is nearly ready for review. we have nearly deleted and combined air lot of the elements that we wanted address in the permit tracking system to address the needs of all the apart -- all of the departments. using a less detailed method for assistance rather than downloading everyone here and having them on interface tracking basis with a planning system. many departments already have records stored in electronic formats but in different venues, so we would need an interface for each type. we do not want to bring them into one system right now where they exist on different servers. a different way of approaching it, but we have got it figured out. we have been working and planning, meeting twice a week on this. we met three or four times this week already. it will be about september 15 before we get it out to the agency, so we are hoping to put out by the end of the year. >> how long after acceptance and review of the bids before the award happens? >> it takes approximately one month to two months to go after the