that are greater than 3 inches in diameter, which is tier one facility, and that are not sill lynn /tkreu cal, which would categorize it as a tier two, but as a tier three because it needs three equipment enclosures in order to satisfy the frequencies that at&t /k*us /phers and network rides on. after the required public notice and hearing, appellants challenged that permit contended at&t failed to comply with article 25. i have two minutes left and i can go on and sort of share with you what else is in our -- what is already in our brief, or i can share with you that we have worked -- our team has worked with mr. rudich, who i believe he didn't say this this evening, to try to find a alternate design where we have agreed to split the equipment. so if i may show you, so the design is on top with the pole as it is, the design proposed below. it has an equipment box, it has an rru unit and the antenna. >> can you say that again into the microphone? >> it basically has the antennas on the top of the box, it has the rru equipment and a [inaudible]. so we have agreed to -- we've worked with them t