assistant deputy chief tony rivera. in terms of fire station 16, the latest developments are an updated schedule has been submitted to d.p.w. on behalf of the contractor. there was an issue with the fuel and oil delivery system. i'm not sure if you're aware, station 16 has a fueling pump for diesel, and when it was removed and being replaced, there's been a lot of changes in the regulations, which are controlled by the state of california. we had to incorporate a lot of these changes into the new fire station 16 facility. with that being said, i'm sure you could kind of picture what a lot of -- a lot of those changes have impacted the schedule for the station. we had to completely redesign the tank, the delivery system, the -- not only the tank, but what they call the vault, where the tank is held, so that fuel, if it did -- if the tank did rupture, the fuel would not leach out into the soil. so there's been a lot of challenges to make that happen, and i believe there was -- the initial design was submitted, denied beca