uladzimir kuhara is the progress of future work and is currently underway .rom time to time, with the relevant services , we will inquire about platforms and electric trains and taxi routes along aslutsk. on the new section of the zelenaluzhskaya metro line , a total of 450 chalaveks are running at once. viadzozza cely complex. from construction and installation works, ranging from cladding to installation of systems. in this area , belarusian-made materials and equipment are used as much as possible. the stations, firstly, are almost all ready, naturally satisfied with the implementation, each station has its own specific location, and accordingly, it has its name. the airdrome is called for a reason, it is called due to the fact that it is located near the number one airport in minsk, sludsky station. we visited today to see how it was there the situation is developing, there is still a lot of work, but nevertheless we are going according to plan, work has begun from bangalore station, we are also actively working there to lead the metro to melnikaity stree