22
22
Apr 25, 2024
04/24
by
IRINN
tv
eye 22
favorite 0
quote 0
overseas, especially in the subcontinental region the uma oya project is just a project.fact , it is not considered a unit in sri lanka because the machines that the company implementing this project imported into sri lanka are still available in sri lanka, and it is economically beneficial for sri lanka to use them again , in addition to this good technical and technological history. this company has caused us in all our meetings at all levels to insist that this company enter new projects again, and the sri lankan government is also keen on this issue, especially that the people of serendip island consider oma oya as a permanent work of iranian engineers in they know their land and the praise of its contractors has been accompanied by their praise of the islamic project of iran. it has become a symbol of iran in sri lanka and we are happy to complete this multipurpose project. the 120 mw uma oya hydro power plant is on the verge of opening with all the ups and downs to start electrifying thousands of villages in this country. all the tests related to the dam have been d
overseas, especially in the subcontinental region the uma oya project is just a project.fact , it is not considered a unit in sri lanka because the machines that the company implementing this project imported into sri lanka are still available in sri lanka, and it is economically beneficial for sri lanka to use them again , in addition to this good technical and technological history. this company has caused us in all our meetings at all levels to insist that this company enter new projects...
14
14
Apr 23, 2024
04/24
by
IRINN
tv
eye 14
favorite 0
quote 0
this project starts from the uma oya river. with the construction of the pol-pela dam, the concrete qolteki pulas, which is built on the umaya river, is 35 meters high and has a crest length of 180 meters, and the second hundred is the daira dam, which is built on the mahatilo oya river, at a height of 50 meters, and is about 175 meters long. a tunnel with a height of 4 km will circle the reservoir of this dam to the second level. it brings the water that you have the hundred pawl pula reservoir is collected through a tunnel and transferred to the deyraba reservoir. this tunnel, which is called the connecting tunnel between two sadrs, is about 4 kilometers long. this tunnel is made by drilling and blasting in the traditional way. this dam is built with a height of 50 meters , with a storage volume of about 1 million cubic meters of water, which is stored here and in a hundred palpelas. it is collected here and transferred to the power plant through the part that is the entrance of the long tunnel. the length of the long tunnel
this project starts from the uma oya river. with the construction of the pol-pela dam, the concrete qolteki pulas, which is built on the umaya river, is 35 meters high and has a crest length of 180 meters, and the second hundred is the daira dam, which is built on the mahatilo oya river, at a height of 50 meters, and is about 175 meters long. a tunnel with a height of 4 km will circle the reservoir of this dam to the second level. it brings the water that you have the hundred pawl pula...
20
20
Apr 26, 2024
04/24
by
IRINN
tv
eye 20
favorite 0
quote 0
of iranian contractors before , come to iranian engineers to carry out a difficult project in the uma oyaa, 20 km from the capital city of colombo. umaya project is the biggest engineering service export project in iran. the project of imams in terms of the amount of issuance. iran, other companies also go abroad to do executive work, which is the basis of engineering work, the reality of omaya project in the projects that iran has been able to get in other countries so far, umaya project is the biggest project in terms of amount and even in terms of the type of work, in terms of the complexity of the work, the umaya project is an indicator in iran, a multi-purpose project and a hundred power plants. upstream of this engineering structure, a large amount of water from the river and streams of the uma oya region is collected in two hundred tanks. one is polpola and the other is dayraba. these two dams are connected by a four-kilometer tunnel. projemaya has 2 to 100 at the top, which collects the water of the river. transported through tunnels. it also provides electricity downstream and on
of iranian contractors before , come to iranian engineers to carry out a difficult project in the uma oyaa, 20 km from the capital city of colombo. umaya project is the biggest engineering service export project in iran. the project of imams in terms of the amount of issuance. iran, other companies also go abroad to do executive work, which is the basis of engineering work, the reality of omaya project in the projects that iran has been able to get in other countries so far, umaya project is...
17
17
Apr 25, 2024
04/24
by
IRINN
tv
eye 17
favorite 0
quote 0
in 2007, the contract for the construction of uma oya dam and power plant was signed between iran and lanka, and the implementation of this project began in 2008. and now today with the presence of the president. the islamic republic is ready to participate in the development of sri lanka , and i will share with you all my experiences, which are the result of 45 years of effort of iranian men and women . this project includes the construction of 200 water transmission channels power plant and power transmission lines. this complex project has been designed and implemented with special goals , among which we can mention the production of 120 megawatts of electricity, the construction of two dams with the use of inter-basin water transfer, the supply of drinking water for part of the people and the supply of water for 5 thousand hectares of agricultural land. uma oya tunnel and power plant in sri lanka is a symbol of trust in technical ability and doing all the activities by ourselves , we transferred our engineering technical ability in terms of specialized discussions to us. in fact,
in 2007, the contract for the construction of uma oya dam and power plant was signed between iran and lanka, and the implementation of this project began in 2008. and now today with the presence of the president. the islamic republic is ready to participate in the development of sri lanka , and i will share with you all my experiences, which are the result of 45 years of effort of iranian men and women . this project includes the construction of 200 water transmission channels power plant and...
22
22
Apr 23, 2024
04/24
by
IRINN
tv
eye 22
favorite 0
quote 0
in 2007, the contract for the construction of uma oya dam and power plant was signed between iran and sri lanka and in 8. it marked many firsts, including the first use of a tb mechanized drilling machine to dig tunnels for this project. this project starts from the uma oya river with the construction of the pul plus 100- hole concrete dam, which is on the water that is stored here and hundreds of pals of money is collected here, and here it is transferred to the power plant through the part that is the entrance to the long tunnel, and finally, the water that is in the power plant turns its energy into electricity through a turbine, with a 4 km tunnel. it comes and actually enters a level below this area called alikotel here it is explained in detail between the rural agricultural areas with the establishment of this water dam project , the agriculture of the area prospered and indirectly caused income due to the increase in the area of agricultural land , they also benefited from the benefits of the project and the issue of drinking water supply a lot of boundaries. it has been res
in 2007, the contract for the construction of uma oya dam and power plant was signed between iran and sri lanka and in 8. it marked many firsts, including the first use of a tb mechanized drilling machine to dig tunnels for this project. this project starts from the uma oya river with the construction of the pul plus 100- hole concrete dam, which is on the water that is stored here and hundreds of pals of money is collected here, and here it is transferred to the power plant through the part...
18
18
Apr 23, 2024
04/24
by
IRINN
tv
eye 18
favorite 0
quote 0
the contract for the construction of the uma oya dam and power plant was signed between iran and srika and its implementation began in 2009. this project marked many firsts, including the first use of the tbm mechanized drilling machine to dig the tunnels of this project for the first time. hundreds of them were made with reinforced concrete or shotcrete technology also, the use of riseboring technology for the implementation of shafts was implemented for the first time in sri lanka , starting from the uma oya river. with the construction of the pul pla hundred concrete dam , qoltaki pavel plasas, which is built on the omaya river, with a height of 35 meters and a crest length of 180 meters, and the second hundred is ma hundred dayraba, which is built on the ma oya river, with a height of 50 meters, and a crown length of about 175 meters. a 4 km high tunnel dam brings the reservoir water of this dam to the second level of dayraba. the water that collects in the hundred palpela reservoir is transferred to the dayraba reservoir through a tunnel the tunnel, which is a communication tunn
the contract for the construction of the uma oya dam and power plant was signed between iran and srika and its implementation began in 2009. this project marked many firsts, including the first use of the tbm mechanized drilling machine to dig the tunnels of this project for the first time. hundreds of them were made with reinforced concrete or shotcrete technology also, the use of riseboring technology for the implementation of shafts was implemented for the first time in sri lanka , starting...
24
24
Apr 25, 2024
04/24
by
IRINN
tv
eye 24
favorite 0
quote 0
it is the input of uma oya power plant, which has been in operation for about two months, and iranian engineers are still working. iranian experts can really achieve this ability to be able to do anything in the field in the field of design, whether in the field of implementation or in the field of user. 520 million dollars by the sri lankan government , a lot of technical and engineering service exports have been made to the country, naheed khodadadi of sed and sima news agency. ladies and gentlemen, now it's time to go to the city of household goods, put it on the floor, well, well, well, well, i don't have a check, bye, everyone, bye, no, madam , i don't want a check, will you be my guarantor at all. my guarantor does not want to pay in advance to the city of home appliances . he does not want to pay in advance. a special purchase for dear retirees. social security from the city of home appliances. where are you? are you fine? don't worry. we came to sarai irani to buy an air conditioner. at this time of the year, the special sale of air conditioners in iran's large sarai has begun
it is the input of uma oya power plant, which has been in operation for about two months, and iranian engineers are still working. iranian experts can really achieve this ability to be able to do anything in the field in the field of design, whether in the field of implementation or in the field of user. 520 million dollars by the sri lankan government , a lot of technical and engineering service exports have been made to the country, naheed khodadadi of sed and sima news agency. ladies and...
22
22
Apr 24, 2024
04/24
by
IRINN
tv
eye 22
favorite 0
quote 0
with the president's visit to sri lanka , the uma oya multi-purpose project was opened with the aim of exporting iranian technical and engineering services in the fields of water transfer dam construction and electricity generation. 400 iranian engineers cooperated with the sri lankan government in the implementation of this project. sri lanka is a country surrounded by the waters of the indian ocean. for years, the varans of silasa have had problems in the field of water resources management and supply. and delivered to the employer by the executor. iranian, the completed project of this project includes the construction of 200 water transmission tunnels and power plants and electricity transmission lines. at the route to transfer this water and in order to make the best use of this facility and project, an underground power plant with two power plant units with a capacity of two units of 60 megawatts, a total of 120 megawatts, has been built, which can produce 290 gigawatt hours of energy per year. a symbol of confidence in the technical and executive ability of iranian engineers is
with the president's visit to sri lanka , the uma oya multi-purpose project was opened with the aim of exporting iranian technical and engineering services in the fields of water transfer dam construction and electricity generation. 400 iranian engineers cooperated with the sri lankan government in the implementation of this project. sri lanka is a country surrounded by the waters of the indian ocean. for years, the varans of silasa have had problems in the field of water resources management...
28
28
Apr 24, 2024
04/24
by
IRINN
tv
eye 28
favorite 0
quote 0
it starts from the uma oya river. with the construction of the pol pella dam. kaltaki pal plasas concrete dam, which is built on the umaya river, is 35 meters high and 180 meters long, and the second hundred is the dayraba dam, which is built on the mahatilo oya river. 50 meters high, about 175 meters long the crown of a hundred tunnels at a height of 4 km brings the water of this hundred reservoir to the second level of deyraba. the water collected in the hundred pail pula reservoir is transferred to the dayraba reservoir through a tunnel. this tunnel, which is a communication tunnel between two hundred names, is about four kilometers long, which was built by drilling and blasting in the traditional way. this is an open circular dam, which is a hundred pieces of concrete. it is built with a height of 50 meters , with a tank volume of about 1 million cubic meters, the water that is stored here and a hundred palpelas is collected here, and here through the part that is the entrance of the long tunnel , it is transferred to the power plant, the length of the long
it starts from the uma oya river. with the construction of the pol pella dam. kaltaki pal plasas concrete dam, which is built on the umaya river, is 35 meters high and 180 meters long, and the second hundred is the dayraba dam, which is built on the mahatilo oya river. 50 meters high, about 175 meters long the crown of a hundred tunnels at a height of 4 km brings the water of this hundred reservoir to the second level of deyraba. the water collected in the hundred pail pula reservoir is...
16
16
Apr 24, 2024
04/24
by
IRINN
tv
eye 16
favorite 0
quote 0
in front of the milad tower of iranian engineers, drilling in the heart of uma oya land is one of the biggest international projects of iran in sri lanka, which after 13 years of implementation is now ready for official operation, the most important goal of this project. transferring water from the water-rich part of sri lanka to the low-water part and irrigating about 5,000 hectares of land is actually in this country, as well as producing electricity by electromagnetism . this design and its uniqueness in design and execution caused. that we can do this as one we will provide special engineering projects in iran to other companies that will request such projects. power imbalance in sri lanka and power outage is one of the problems of this country. sri lanka has a huge electricity deficit. if you live somewhere other than colombo for a day , you will definitely experience a power outage. i have frequent power outages, which means four or five power outages in one day. naheed khodadi news agency. they targeted the center of the gaza strip, and in this crime , four palestinian citizens
in front of the milad tower of iranian engineers, drilling in the heart of uma oya land is one of the biggest international projects of iran in sri lanka, which after 13 years of implementation is now ready for official operation, the most important goal of this project. transferring water from the water-rich part of sri lanka to the low-water part and irrigating about 5,000 hectares of land is actually in this country, as well as producing electricity by electromagnetism . this design and its...
31
31
Apr 24, 2024
04/24
by
IRINN
tv
eye 31
favorite 0
quote 0
, the uma oya power generation dam project, which includes 200 power plants with the power of producing megawatts of electricity. this is a good engineering work by iranians in sri lanka. and it has become a symbol of iran in the country. this project is the beginning of other technical and engineering projects of iran in sri lanka. after this construction project, 560 million the construction of the water supply tunnel in srileka was another step to consolidate and expand the relations between the 120 megawatt power plant , which is the most valuable and clean power plant. produces, and now that the president has visited this country , it is a good opportunity to increase the volume of iran's trade relations, which is currently around 200 million dollars, to 500 million dollars , seyyed hossein kazemnia, the minister of economy, announced to the radio and television news agency, the second meeting of policy convergence today , the country's foreign exchange will be hosted by the parliament government to islamic development bank. and the bank announced the re-financing of projects relat
, the uma oya power generation dam project, which includes 200 power plants with the power of producing megawatts of electricity. this is a good engineering work by iranians in sri lanka. and it has become a symbol of iran in the country. this project is the beginning of other technical and engineering projects of iran in sri lanka. after this construction project, 560 million the construction of the water supply tunnel in srileka was another step to consolidate and expand the relations between...
17
17
Apr 25, 2024
04/24
by
IRINN
tv
eye 17
favorite 0
quote 0
monsoon rains, but the areas that have stable water in 2007, the contract for the development of uma oya dam and power plant was signed between iran and sri lanka . the implementation of this project began in 2008 and now it was inaugurated today with the presence of the president. the islamic republic is ready to partner in the development of sri lanka. and share with you all my experiences, which are the result of 45 years of effort of iranian men and women . this project includes the construction of 200 water transmission tunnels, power plants and electricity transmission lines. this complex project has been designed and implemented with special goals , including the production of 120 megawatts of electricity , the construction of two hundred with the use of inter-water transfer. providing drinking water for a part of the people and providing water for 5 thousand hectares of agricultural land, and the uma oya electric power plant in sri lanka is a symbol of trust in the technical and executive ability of iranian engineers , iranian experts can really achieve this ability in the field
monsoon rains, but the areas that have stable water in 2007, the contract for the development of uma oya dam and power plant was signed between iran and sri lanka . the implementation of this project began in 2008 and now it was inaugurated today with the presence of the president. the islamic republic is ready to partner in the development of sri lanka. and share with you all my experiences, which are the result of 45 years of effort of iranian men and women . this project includes the...
11
11
Apr 24, 2024
04/24
by
IRINN
tv
eye 11
favorite 0
quote 0
iranian drilling in the heart of uma oya land is one of the biggest international projects of iran in sri lanka, which is now ready for official exploitation after about 13 years of implementation. the most important goal of this project is to transfer water from the water-rich part of sri lanka to the low-water part and irrigating about 5 thousand hectares of land is actually in this country. as well as electricity production by electromagnetism, the entire design and implementation of this project was done by good iranian companies and very good iranian engineers. to other companies that will be applying for such projects , we would like to present electricity imbalance in sri lanka and power outages as one of the problems. this is the country, sri lanka has a huge electricity deficit, if you ever live somewhere other than colombo. you will definitely experience power outages. my power outages are frequent, that is, there may be four or five power outages in one day. the country of esranka does not have any fossil fuels, and its electricity supply is only hydroelectricity and a very
iranian drilling in the heart of uma oya land is one of the biggest international projects of iran in sri lanka, which is now ready for official exploitation after about 13 years of implementation. the most important goal of this project is to transfer water from the water-rich part of sri lanka to the low-water part and irrigating about 5 thousand hectares of land is actually in this country. as well as electricity production by electromagnetism, the entire design and implementation of this...
16
16
Apr 25, 2024
04/24
by
IRINN
tv
eye 16
favorite 0
quote 0
in 2007, the contract for the construction of uma oya dam and power plant was signed between iran and sri lanka, and the implementation of this project began in 2008. this project produces electricity with an annual transmission of 145 million cubic meters. and by irrigating 5 thousand hectares of agricultural land , the economic prosperity of the people of sri lanka will be zero up to 100 design, supply, execution, painting and delivery to the client by the iranian contractor. the project includes the construction of 200 water transmission tunnels, power plants and electricity transmission lines. the purpose of this project is to transfer water from a high rainfall area to a low rainfall area. for this reason, the water that collects in the hundred pavel pula reservoir is transferred to the deiraba reservoir through a tunnel on the way to transfer this water, and in order to make the best use of this facility and the project of an underground power plant with two power plant units with a capacity of two units of 60 megawatts, a total of 120 megawatts it is estimated that 290 hours pe
in 2007, the contract for the construction of uma oya dam and power plant was signed between iran and sri lanka, and the implementation of this project began in 2008. this project produces electricity with an annual transmission of 145 million cubic meters. and by irrigating 5 thousand hectares of agricultural land , the economic prosperity of the people of sri lanka will be zero up to 100 design, supply, execution, painting and delivery to the client by the iranian contractor. the project...
27
27
Apr 23, 2024
04/24
by
IRINN
tv
eye 27
favorite 0
quote 0
this project starts from the uma oya river with the construction of the pul -pela hundred concrete dam, which was built on the omaya river. our second hundred is the dayraba dam, which was built on our oya river . which is the entrance of the long tunnel, it is transferred to the power plant and finally, the water in the power plant turns its energy into electricity through a turbine in a tunnel. it comes four kilometers and actually enters a level downstream of this area called alikotel, which goes there and falls, from here it is explained between the rural agricultural areas with the establishment of this water impoundment project, which was created, the agriculture of the area flourished and indirectly caused income. due to the increase in the area of agricultural land, they also benefited from economic benefits. the project and the issue of drinking water supply have been resolved to a great extent. the production of 295 gigawatt hours of energy per year to supply water needed for 5 thousand hectares of agricultural land in the dry region of southeastern sri lanka is one of the
this project starts from the uma oya river with the construction of the pul -pela hundred concrete dam, which was built on the omaya river. our second hundred is the dayraba dam, which was built on our oya river . which is the entrance of the long tunnel, it is transferred to the power plant and finally, the water in the power plant turns its energy into electricity through a turbine in a tunnel. it comes four kilometers and actually enters a level downstream of this area called alikotel, which...
25
25
Apr 23, 2024
04/24
by
IRINN
tv
eye 25
favorite 0
quote 0
implementation of uma oya multipurpose project in sri lanka. this huge project includes the construction of 200 water transmission tunnels and a power plant and electricity transmission line, which will also irrigate 5 thousand hectares of agricultural land. the 530 million dollar construction cost of this project was provided and paid by the sri lankan government, and it is a complex and unique iranian project across the borders. construction of 24 km tunnel in the heart of saab al-abour mountain with high pressure underground water. construction of one of the longest vertical tunnels in the world, 618 meters long. construction of a 120 mw power plant at a depth of 750 meters. this the project, which was put into operation by following up in the 13th government, is a symbol of friendship and economic cooperation between iran, sri lanka, the strong iranian people's government , and the ministry of energy. every day, many ideas come to our mind for the prosperity of business. in order to achieve what we have in mind as soon as possible, we shoul
implementation of uma oya multipurpose project in sri lanka. this huge project includes the construction of 200 water transmission tunnels and a power plant and electricity transmission line, which will also irrigate 5 thousand hectares of agricultural land. the 530 million dollar construction cost of this project was provided and paid by the sri lankan government, and it is a complex and unique iranian project across the borders. construction of 24 km tunnel in the heart of saab al-abour...
35
35
Apr 25, 2024
04/24
by
IRINN
tv
eye 35
favorite 0
quote 0
in 2007, the contract for the construction of the uma oya dam and power plant between iran and sri lanka was signed and the implementation of this contract began in 2009. this project produces electricity with an annual transfer of 145.
in 2007, the contract for the construction of the uma oya dam and power plant between iran and sri lanka was signed and the implementation of this contract began in 2009. this project produces electricity with an annual transfer of 145.
18
18
Apr 24, 2024
04/24
by
IRINN
tv
eye 18
favorite 0
quote 0
one hundred iranian uma oya to pakistan will be inaugurated in sri lanka with the presence of the presidentsof the two countries. at least 10 martyrs in the attacks this morning, the zionist regime to gaza. the us senate approved 95 billion dollars in aid to the zionist regime in ukraine and taiwan. the american police also suppressed the gatherings of american students in support of gaza.
one hundred iranian uma oya to pakistan will be inaugurated in sri lanka with the presence of the presidentsof the two countries. at least 10 martyrs in the attacks this morning, the zionist regime to gaza. the us senate approved 95 billion dollars in aid to the zionist regime in ukraine and taiwan. the american police also suppressed the gatherings of american students in support of gaza.
16
16
Apr 24, 2024
04/24
by
IRINN
tv
eye 16
favorite 0
quote 0
uma oya multipurpose scheme in sri lanka.s huge project includes the construction of 200 water transmission tunnels and a power plant and electricity transmission line, which will also irrigate 5 thousand hectares of agricultural land. 530 million dollars for the construction of this project was provided and paid by the government of sri lanka and a project. it is on the other side of the borders with a complex and unique iranian performance. construction of 24 km tunnel in the heart of saab al-abour mountain with high pressure underground water. construction of one of the longest vertical tunnels in the world, 618 meters long. construction of a 120 megawatt power plant at a depth of 750 meters. this project, which was implemented in the 13th government, is a symbol of the friendship and economic cooperation between iran and sri lanka. people's government, strong iran, ministry of energy. buy this year at last year's price. well done, did you hear that this year they say last year's price? this year they say last year's price
uma oya multipurpose scheme in sri lanka.s huge project includes the construction of 200 water transmission tunnels and a power plant and electricity transmission line, which will also irrigate 5 thousand hectares of agricultural land. 530 million dollars for the construction of this project was provided and paid by the government of sri lanka and a project. it is on the other side of the borders with a complex and unique iranian performance. construction of 24 km tunnel in the heart of saab...
25
25
Apr 24, 2024
04/24
by
IRINN
tv
eye 25
favorite 0
quote 0
approximately one and a half times the size of milad tower , iranian engineers, digging in the heart of uma oya, one of the biggest plans iran international airport is in sri lanka, which is ready for official operation after about 13 years of implementation. the most important goal of this project is to transfer water from the water-rich part of sri lanka to the low-water part and irrigate about 5 a thousand hectares of land is actually in this country , as well as electricity production by electromagnetism. all design and implementation of this project by there were good iranian companies and very good iranian engineers. the complexity of this project and its uniqueness in design and implementation have made us able to present this as a special engineering project in iran to other companies that will be applying for such projects. power imbalance in sri lanka and power outage is one of the problems of this country. sri lanka has a huge electricity deficit. if you live in one day other than the city of columbus or another, it will definitely be cut off you must experience electricity. power cu
approximately one and a half times the size of milad tower , iranian engineers, digging in the heart of uma oya, one of the biggest plans iran international airport is in sri lanka, which is ready for official operation after about 13 years of implementation. the most important goal of this project is to transfer water from the water-rich part of sri lanka to the low-water part and irrigate about 5 a thousand hectares of land is actually in this country , as well as electricity production by...
26
26
Apr 25, 2024
04/24
by
IRINN
tv
eye 26
favorite 0
quote 0
tehran and the risk of further sanctions against the countries, the multi-purpose project and the uma oyactric power plant, which was built by iranian engineers , was inaugurated in sri lanka with the presence of the presidents of the two countries. the deputy spokesperson of the us department of state warned on wednesday anyone who is thinking about a business deal with iran be aware of the risk of sanctions. the times of india also wrote hours after this recommendation, right after the white house warned about trade with iran , the officials of the two countries emphasized on holding future meetings to finalize the free trade agreement faster . the first round of the national exam in 1403 began with the competition of candidates of experimental groups of mathematical and technical sciences and humanities. the exam of art and foreign language groups will be held today. tomorrow morning, the test of experimental science group will be held. the preliminary results of the national exam will be published in the middle of august. exam candidates the first batch of 1403 entered the field of co
tehran and the risk of further sanctions against the countries, the multi-purpose project and the uma oyactric power plant, which was built by iranian engineers , was inaugurated in sri lanka with the presence of the presidents of the two countries. the deputy spokesperson of the us department of state warned on wednesday anyone who is thinking about a business deal with iran be aware of the risk of sanctions. the times of india also wrote hours after this recommendation, right after the white...
18
18
Apr 23, 2024
04/24
by
IRINN
tv
eye 18
favorite 0
quote 0
implementation of uma oya multipurpose project in sri lanka.s huge project includes the construction of 200 water transmission tunnels and a power plant and electricity transmission line, which will also irrigate 5 thousand hectares of agricultural land. the 130 million dollar construction cost of this project was provided and paid by the sri lankan government and it is a complex and unique iranian project on the other side of the border. construction of 24 km tunnel in the heart of saab al-abour mountain with high pressure underground water. construction of one of the longest vertical tunnels in the world, 618 meters long. construction of a 120 megawatt power plant at a depth of 750 meters. this project, which was implemented in the 13th government, is a symbol of iran's friendship and economic cooperation. in the name of allah, the most merciful, the most merciful, dear viewers of the khabar network. the khabar network, which has been kind to us and carried out this coverage, and most importantly, i apologize to the transportation of the coun
implementation of uma oya multipurpose project in sri lanka.s huge project includes the construction of 200 water transmission tunnels and a power plant and electricity transmission line, which will also irrigate 5 thousand hectares of agricultural land. the 130 million dollar construction cost of this project was provided and paid by the sri lankan government and it is a complex and unique iranian project on the other side of the border. construction of 24 km tunnel in the heart of saab...
27
27
Apr 25, 2024
04/24
by
IRINN
tv
eye 27
favorite 0
quote 0
the 120 megawatt uma oya hydropower plant is on the verge of opening with all the ups and downs to startng electricity to a thousand villages in this country. all chest related tests have been done and this project is supposed to be officially started with the presence of the president of our country. another page is registered in the book of honors of iran and iran. other nature is sometimes the host of this kind of happiness, where it is both a place of recreation and a place to make a living. making a living in nature is sometimes accompanied by additional sounds, sounds that announce the change of nature. you are faced with a significant and stunning volume of all kinds of mineral wastes in the environment. these are not against the extraction of minerals and development, but in fact , a balance must be created. this soil is destroying our lives because these mines are long soil. the wind is blowing into our gardens, and the crops and agricultural land, the plants around our village have all been destroyed. as you can see , there was an aqueduct here that is 600 years old and has bee
the 120 megawatt uma oya hydropower plant is on the verge of opening with all the ups and downs to startng electricity to a thousand villages in this country. all chest related tests have been done and this project is supposed to be officially started with the presence of the president of our country. another page is registered in the book of honors of iran and iran. other nature is sometimes the host of this kind of happiness, where it is both a place of recreation and a place to make a...
24
24
Apr 24, 2024
04/24
by
IRINN
tv
eye 24
favorite 0
quote 0
the uma oya tunnel and power plant in sri lanka is a symbol of trust in the technical and executive power of iranian engineers. it is the entrance to the oma oya power plant , which is about two months it has been put into operation and iranian engineers are still working. it is the activity of iranian experts who really have this ability finding that they can do all the activities themselves , whether in the field of design, implementation, or operation, from zero to 100. the people of sri lanka and iran shared their knowledge with us in such a way that some of our engineers became a lot of technical and engineering services have been exported to the country. nahid khodadadi, the head of the european union's foreign policy, said that the zionist regime has violated the security council's resolution on providing light assistance. in the 6th session of april, the security council approved the establishment of a ceasefire in gaza, the release of azadi estra and the sending of necessary aid, but the zionist regime has defied the resolution. about the zionist regime's accusations, joseph burr
the uma oya tunnel and power plant in sri lanka is a symbol of trust in the technical and executive power of iranian engineers. it is the entrance to the oma oya power plant , which is about two months it has been put into operation and iranian engineers are still working. it is the activity of iranian experts who really have this ability finding that they can do all the activities themselves , whether in the field of design, implementation, or operation, from zero to 100. the people of sri...
31
31
Apr 23, 2024
04/24
by
IRINN
tv
eye 31
favorite 0
quote 0
the multi -purpose project of uma oya dam and power plant, which was built by iranian engineers, is supposed to be inaugurated with the presence of the president. during the visit, pakistan, iran and islamabad signed eight documents of cooperation. during the president's visit to pakistan, 8 joint cooperation documents were signed between the officials of the two countries. in different economic sectors. science and technology, agriculture, health, culture and legal and judicial issues. in the economic field, the creation of free trade zones at common border crossings and cooperation in the standard department was one of the most important documents. the action that i took in the service of mr. prime minister during a short trip to the border point was a manifestation of the cooperation of the two countries for the work of border trade between the two. the country with the border markets. during this so-called trip, we signed an agreement with the high board of investment of pakistan, which is the trustee of the free zones in that country. in this trip, the high-ranking delegations of the tw
the multi -purpose project of uma oya dam and power plant, which was built by iranian engineers, is supposed to be inaugurated with the presence of the president. during the visit, pakistan, iran and islamabad signed eight documents of cooperation. during the president's visit to pakistan, 8 joint cooperation documents were signed between the officials of the two countries. in different economic sectors. science and technology, agriculture, health, culture and legal and judicial issues. in the...
16
16
Apr 24, 2024
04/24
by
IRINN
tv
eye 16
favorite 0
quote 0
also, with the construction of the uma oya power plant, 120 megawatts of electricity will be produced. the country is added. during mr. raisi's visit to pakistan, both sides signed 8 documents of cooperation. during the president's visit to pakistan, 8 joint cooperation documents were signed between the officials of the two countries. in various economic sectors, science and technology, agriculture, health, culture and legal and judicial issues, in the economic field, the creation of free trade zones at common border crossings and cooperation in the standard sector were among the most important documents. the action i took in the service of mr. prime minister during a short trip to the border point was a demonstration from the cooperation of the country for the work of border trade between the two countries with border markets. in this so-called trip, we signed an agreement with the high investment board. pakistan, which is in charge of the free zones in that country, is also the same board. god willing , we will start the expert work quickly so that we can create this zone very soon.
also, with the construction of the uma oya power plant, 120 megawatts of electricity will be produced. the country is added. during mr. raisi's visit to pakistan, both sides signed 8 documents of cooperation. during the president's visit to pakistan, 8 joint cooperation documents were signed between the officials of the two countries. in various economic sectors, science and technology, agriculture, health, culture and legal and judicial issues, in the economic field, the creation of free trade...
11
11
Apr 24, 2024
04/24
by
IRINN
tv
eye 11
favorite 0
quote 0
lanka in continuation of his trip to the south asian region the river the multi-purpose project of uma oya dam and power plant, which was built by iranian engineers, is going to be inaugurated with the presence of mr. raisi. during the president's visit to pakistan, 8 cooperation documents were signed. at zero president to pakistan, 8 joint cooperation documents were signed between the officials of the two countries in various sectors of economy, science and technology, agriculture, health, culture and legal and judicial issues. in the economic field, the creation of free trade zones at common border crossings and cooperation in the standard sector were among the most important documents. the action i took in the service of mr. prime minister during a short trip to the border point it was a manifestation of the country's cooperation to work on border trade between the two countries with border markets. during this so-called trip, we signed an agreement with the high investment board of pakistan, which is also the trustee of the free zones in that country . we will start the research so tha
lanka in continuation of his trip to the south asian region the river the multi-purpose project of uma oya dam and power plant, which was built by iranian engineers, is going to be inaugurated with the presence of mr. raisi. during the president's visit to pakistan, 8 cooperation documents were signed. at zero president to pakistan, 8 joint cooperation documents were signed between the officials of the two countries in various sectors of economy, science and technology, agriculture, health,...
16
16
Apr 25, 2024
04/24
by
IRINN
tv
eye 16
favorite 0
quote 0
the uma oya electricity production dam project, which includes two hundred power plants with power. it has become a symbol of iran in the country. this project is the beginning of other technical and engineering projects of iran in sri lanka. after this plan , the construction of the $560 million water supply tunnel project in sarinka was another step to consolidate and expand the bilateral relations of the 120-generation power plant. and now that the president has visited this country, it is a good opportunity to increase the volume of iran's trade relations , which is currently about 200 million dollars, to 500 million. seyyed hossein kazemnia , director general of the textile and clothing industry office of the ministry of silence, says that in order to make clothes , the first step is to apply glue for all kinds of children's clothes, and in general, it is mandatory to apply the adhesive to the skin of the body. has been announced according to mr. executive georgian. this standard started this year . it is the customer's right to be aware of the composition of the materials and
the uma oya electricity production dam project, which includes two hundred power plants with power. it has become a symbol of iran in the country. this project is the beginning of other technical and engineering projects of iran in sri lanka. after this plan , the construction of the $560 million water supply tunnel project in sarinka was another step to consolidate and expand the bilateral relations of the 120-generation power plant. and now that the president has visited this country, it is a...