the size of the fire station is also not unausual as the projsect the same site and has the same capacity. the estimated construction schedule is 14 months and doesn't appear to be anything unusual about the type of construction proposed, therefore the department believes there are no unusual circumstances present at the site or where w the project. we have evaluated the appellates claims the project can have significant effects on the environment in air quality, hazardous material, nys, land use [inaudible] regarding haserdize materials, we explained the history regarding a 1987 underground storage tank and in 1998 the fire station installed a 3 thousand gallon underground storage tank and discovered a 600 gallon ust when it went through the snaugz process. soil samples were collected and it was determined hydrocarbon levels didn't exceed allowable state levels and dph approved the closure in place of that 600 gallon underground storage tank. therefore, the project site poses no environmental or human health hazards. the project removes the 1600 gallon storage tank and replacing it. this