subcontractor bid package for structural steel subject to city certification of the final eir, approval undersea sequa. >> so moved. >> second. >>commissioner woo ho: when you mentioned under option 2, how much money would be expended? you mentioned you could cancel at so -- as some point, but how much money would have been invested? to go i do not have the table, but i think the last part would be installation, which i believe was $2.7 million. the first part of the shop drawings, which is basically engineering time of 225,000. after that the steel would be ordered and delivered to the fabricator and brought to their sight. the added labor for fabrication -- >> it would not be all this deal? then you said you could resell it if for some reason -- >> we could reuse it on other projects, but we get the most of you before it is fabricated, certainly after it is installed we only have one use for it. take a right. thank you. -- >> right. >> it is 3.7 million we would have been advanced. i would say would be advanced for steel use somewhere else. it could be used at the back plants, pier 70, any number of