there are uneen surfaces. and the second is to work with neighbors they have time constraints we will wait until the rainy season passes and fix the immediate points first. and oui will work with our neighbors to figure it out. time. i don't see questions. we'll hear from dbi. >> good evening. there was a request what am be replaced in the stairs per plans on ground floor replace 2 posts and the stringer. and the second floor a new post and new string and third a new string and mentioned replacing the deteriorated treads. if that of the building inspector during the inspections decide that is more than 50% they require another permit. so -- we are you still did not answer my question i will not pickow. what i'm trying to hear is -- help resolve this issue. the issue of the wall and the repair and the wall. the civil manner. see you in court tht answer i would offer. differences with the case they wanted take down the entire fire stairs. and that was a big deal. here what i am hearing is that is that they want