harrison street is probably the most unfriend liest.you have to walk single file so i'm glad to see we are doing the widening >> one final thing on that is harrison street isn't going to be built until folsom is done because for construction impact we don't want to shut down the 2 lane streets in the neighborhood, so if for whatever reason there was a change there is plenty of time to revisit that. in adopting the plan we are not lock tg in stone, we are setting a policy but the details can be worked out later >> what sth timeline for the folsom street streetscapeing for the rin conhill portion? >> it is technically in the oci plan area so the timeline is something the planning department has very little control over but the goal is start construction in 2016 i believe and be done in 2017 and harrison street would start >> in mid2017 >> assuming folsom finishes on time harrison will start >> i know the neighborhoods would like to see that occur as soon as possible. i want reiterate the infrastructure financing district the board of supe