two of them were unoperational. then, on october 3, the final unit failed, and temperatures in the building reached over 90°. h.s.a. is currently using portable units so it is comfortable. i am joined today by scby seve of the staff, and we are happy to answer your questions. >> supervisor fewer: thank you. supervisor stefani? >> supervisor stefani: just a quick question. did we understand the extent of the repairs at the time we entered into the lease? >> sure. i'm going to turn that over to scott wall. >> yes. would you mind repeating that? >> supervisor stefani: yes. i'm wondering if we understood the tenant improvements that were needed at the time we actually entered the lease? >> so the lease was entered into before my time as director, but i would say mantha estimathat estimate was on the low end for tenant costs. that was about $6 million per the lease, but after further investigation and going through the systems, that does look like it was not enough to complete all the necessary repairs to the building. >