pier 29 is currently unownershipped. real estate has potential tenants to occupy it. we'll extend the life of the pier for 30 years if not longer as well as minimize future repairs which will be less accessible t due to sea level rise. this is an overview of pier 31-point a. the blue area is the project footprint. the embarcadero will be to the south and pier 31 on the left and pier 33 on the right. they extend eastward into the bay. the alcatraz ferry is at the top of the screen. the blue color represents the footprint. the colors and lines indicate the repair type and locations. we've also solicited for two alternate areas pier 31 and 33. however, due to budget constraints, we'll not be awarding these and they will not affect operations. this is an overview of the footprint at pier 2 29 embarcado on the right. peer -- i'm sorry embarcadero at the bottom of the page. pier 27 to the right. the pier extends into the bay. there is a quick summary of the nature of the work. as we discussed in october, over time water can infiltrate concrete and causes the rebar to expand