i identify that because it is plaster we see on the unter berger side of the property to that point. at that point, there is an abrupt transition to siding on all three levels. commissionger fung: throughout the brief, it talks about work has been stopped. can you describe a little bit further what that means? you're saying the interior alterations are totally stopped? >> at this point, that is effectively where we are. we cannot complete work without doing work on an area where her interior finishes are attached and if we do that we risk serious damage. if it cannot coordinate the work -- commissionger fung: is the rest of the interior work completed? >> studds is what we have been able to complete. we still have foundation work to do along with the area of this wall in order to raise the foundation. right now, the bottom of the studs are rotted. we need to raise the foundation in order to fix the problem. there are drainage issues that have been caused by the work next door. we need to raise that foundation. we only have a rough utilities. commissioner hwang: is the house uninhabit