after all, without exception, all the inhabitants of usolye-siberian literally lived on a slow-motionthe town; it was removed only recently on june 1, when the liquidators got rid of twelve. waste wells were dismantled by the mercury electrolysis shop as a whole, and we have to comply with the state under the contract, the demolition of 204 buildings, in total, with a volume of more than 3 million m³ in building structures, a huge territory, after complete liquidation, will surely attract investors on the one hand for residents - these are new jobs, on the other, phantom pains, which, if the new owners turn out to be just as irresponsible, exclude history repeating due to new federal law. this is the so-called muslim law, which will no longer allow enterprises, owners of enterprises, to throw industrial waste into production, so that such enterprises did not remain a headache for the citizens of these settlements. meanwhile, there are many such hot environmental spots in the country over the 3 years of the implementation of the national project. ecology under the federal project clean