for the site just north of broadway, we recommend the valejo be connected, and the front street be extended north of to the embarcadero as well, creating two new public spaces. additionally, we recommend that the sale, mid law, to maintain a pedestrian involvement. -- midway between. finally, for the size between green and union street, a similar set of recommendations. we would have a more formal extension commerce east to the waterfront, and extending the treatment across in elevated crosswalk. similarly, front street would also be extended up to the embarcadero, and union street would be extended as a pedestrian right of way east to the waterfront -- east of the waterfront. the next set of recommendations deal with the quality of building design, and on this, we did also receive strong support from across the commission. design guidelines should require high-quality materials, vertical articulation, an active ground floors. the active ground floor should extend along the entire link of the embarcadero on the west side. this is a critical pedestrian route, and we envision becoming a criti