, is more than 40 km long, 17 stations are a grandiose plan, now the main work is underway at vavilovskayaion, distillation tunnels are being drilled to the akademicheskaya station and the novatorskaya station, at this at the moment, monolithic construction work is also underway at the beginning of this year with the vavilovskaya station. four tunneling shields were launched. before all the laying of tunnels was started by marina, after her olga we are. in the heart of the tunnel shield tunnel. olga, relying on the mounting rings, the jack moves her by an average of 40 mm per minute. the distance of 2.5 km to the neighboring station akademicheskaya, she, along with her sister marina , will pass in about a year so that the shields do not go astray for the advancement, the driver sits inseparably the screen shows us the pressure on the cylinders with which the cars move. and here are the parameters of the rotor, which rotates, cuts the rock so that the cabbage soup moves at the set speed, all the selected soil automatically rises to the surface with the help of a conveyor, the rotary working