and this contracting organization for vengeraminina did not carry out very much types of different worksge could not be accepted, of course, it turns out that samir asadulaev was ready to pay mikhail chumanov 5 million rubles. in order to knock out a situation of more than 20 million. such. so it turns out, criminal mathematics and, of course. the curator of the head of tuap, sergei stavitsky, should have known there. we decided to look at the section of the road that was reconstructed by asadulaev’s company, accompanied by tuap specialists , our film crew went to the moshkovsky district. this place looks like a road at first glance. how expensive is it highway, novosibirsk sokor, 4 km were to be completed in 2020. this means that the contractor, in accordance with the design documentation, had to mill the old existing coating, level the layer and install the thin coating. this means that how it works is not subject to acceptance. the cost of work in 2020 is 68 million . well, the cost of this volume in voronezh costs 22 million, which we did not mention, that is, 22 million. asadulaev,