we asked energy minister viktor karankevich. viktor mikhailovich, good afternoon , the construction of our belos is already in , say, the final stage, because we plan to launch the second power unit by the end of the year. here's what i need to do today. that's for this time this year, for the energy system to work, and for all the measures that we planned to implement on time, as the president demanded when holding a meeting on the work of the belarusian energy system. and in particular bilayz in the first place. this is a safety issue and all these works and activities that need to be carried out must confirm both the safety and reliability of the operation of all equipment of technological systems, therefore, at the final stage, we are preparing to start a chain reaction and bring the reactor plant to a minimum controlled level everything, this work is carried out within the framework. stage, physically launch will be carried out neutron research. physical characteristics. the active zone of the reactor plant, and now the succ