from the high dam it shows the mighty power of the river, the vilyui is a rare sight. especially for this time of the year, the discharge of water is done so that the vilyui reservoir does not overflow for this energy. 9 more september, the gate was opened at the cascade of the vilyui hpps; such spillways were last done in autumn in 2008. now the surplus has appeared due to prolonged energy rains. they are welcome, because last year there was a drought; now it is exactly the opposite, which also causes trouble. every day we go around the entire pressure front, the hydroelectric complex and look at the changes. that is, we measure and we look at filtration and visual changes, so to speak, it is an organoleptic method. i mean, well, for now , it's all good. everything is within the norm hard work, and in the engine room of the station, preparations are underway for the launch of the second hydroelectric unit since march. it is under major renovation and after a few minutes the exciting moment is very sheer, of course, the exit. eh, for generators, this is always an event