this is in the material. workers vira repetuha, one of them says she is responsible for the preparatory, the second process of the milkmaid, they connect the cow, she sulks, and the third process is already applied, eh, we are going to preserve it. of electricity , says karendarchenyan, deputy director of animal husbandry. therefore, since the beginning of power outages, they have switched to generators, but to date, uh, under the condition of using our generator and when there were once such lights, then almost 80% of their of working potential, we add to the process of the division in the farm has two generators with a capacity of 170 kw, they were purchased in 2020, says the chief energy engineer oleg morchenko, all of them are now red and running, the generator can do it in automatic mode, they can do it manually during a blackout, the generator worked around the clock, recalls the energy engineer weekends on the farm, there is no schedule. you yourself understand. like green, it’s a little easier, but like yellow, i’m generally like red. it’s very difficult here, very high consumpt