plan to put into operation six facilities, these are four take-off and landing stripes, this is vokhodsky, bering. 3,400 m long, taxiways, platform, equipment has been updated, now the airport can accept light ships, and residents will fly long distances without additional transfers, and according to the results of 2023, almost a million people were served at yakutsk airport, which shows an increase in passenger traffic in relation to 2022, in november 2024 the airport. for the second category of approach, which will allow aircraft to be accepted in difficult weather conditions, primarily in fog, and funding for these works is provided by the federal budget, and the ministry of transport of russia carries out the construction and reconstruction of facilities related only to ensuring the take-off and landing of aircraft, and the construction of air terminal complexes, which was also a question, and based on the possibility of making a profit, is carried out at the expense of the airport operator, i want to say that the airport... far eastern federal district there was a large percentage of