infrastructure of the kursk part of the long-distance trains last year was transferred to the new vostochny station. currently underway work on the installation of the roof of the canopies, the wiring of networks, power supply is being done and in the plans so far, that the planned schedule has been observed. until the end of the year, we plan to launch three platforms and new underground republics. also, as part of the second stage , an underground passenger terminal will appear; the station will be convenient for use by the elderly. parents with strollers and passengers with disabilities plan to open it next year for the launch of the mcd-4 itself. yauza i can travel back in time here. for example, this one was built under tsarist russia the bridge i'm on now was built in 2000. well, this is not enough for ntsd-2 trains to pass through it and more mtsd-4 trains were added, therefore, to increase throughput . two more bridges are being built here in order to increase the capacity of this node to the five existing railway tracks. three more bridges need to be added. they are erecting on both sides