vsevic knows about the safety of fuel trucks on the site should not be all the fuel for diesel generatorsks underground. however, this is a necessary measure, otherwise the station and the city will freeze. temporary phenomenon. yes, it will end, well, in the worst scenario. it will be finished in the spring when it becomes warm natural. well, if , after all, the security problem of the zaporizhzhya plant is resolved tomorrow or there in a week, then we, of course , will leave these boiler rooms in the reserve nuclear power plant, as it always warms houses, and the tomograd in energodar lit up street lanterns and a christmas tree were lit in the museum for and the fathers and founders and their students gathered to celebrate energy day friendly hugs flowers photographs as a keepsake a modest festive table and the first toast of an employee combat experience for the team that is now protecting the world. from a nuclear catastrophe for peaceful atom in all six power units at full capacity sberbank presents a loan with the lowest rate over the past 10 years from 4.5% apply for a loan at sber