theres a design-build contract built for warnerville substation and the lower cherry aqueduct emergency rehabilitation project design was finalized in the quarter, although we're still working out the right-of-way with the bureau of land management. although i think we're getting closer and looking forward to geting that resolved so we can move forward with that project. and we've also initiated the condition assessments at o'shaughnessy and cherry dam spillways. we received letters of directives from the california division of safety at dams to do these assessments so we're moving forward with those expeditiously. i'd like the brief you on a few current project issues. this is cherry reservoir recently. you can see it has been lowered and as has been reported in previous reports, we had to lower the reservoir because of the valve -- one of the cone valves failing and the upstream butter fly valve failing meant that in order to do work on the valves downstream of the reservoir, we had to lower the reservoir so we could isolate the valves and do the work inside the tunnel beneath the dam