the wawls, the kitchen and electrical and plumbing and i believe also the second floor is being removed. the original framing from 1907 is two by eight. that's not what is being built here and according to the elevation the second floor is at another elevation. effectively 90% of the structure will be removed. this project should have been sulfur by this and. >> >> and they're going to salvage demolition material and filter it back into the new framing. the sponsor also states the existing structure 1900 feet and the assessor says it's over a thousand. they say they're adding a thousand feet but we show 2400 of inhabitable deck and the building will be three times larger than existings it's not a remodel. it violates the planning code and the san francisco building code chapter 16 because during the earthquake this building will sway across the property line causing substantial damage to this building and the adjoining structures. in conclusion the foregoing constitutes unusual circumstances of the project and the project site under ceqa that mixes this exemption unappropriate. thank yo