i will let bill speak to whitmore.does not work because it does not provide the distance and the coverage. the same thing at the fire station. the fire station is also blocked by much taller buildings. at&t is also decommissioning two macros sites that will improve coverage by reducing interference in the network, but it does enable at&t to remove two microbicides. that is to of a summary to the big issues, but i will let bill speak to the other issues and the distances, which is the only other issue before you. supervisor: could you give us the location? >> yes, one is on third and seventh. not seven, sorry. >> good afternoon, supervisors. my name is bill, and registered engineer. a regular part of our practice is a calculation and elimination of rf, and mcgraw-hill did publish a book on this. our engineers are looking simply at what are the facts. how much will this produce in terms of the levels for this project -- proposed site, or in the case of an existing site, what are the levels. i agree with everything that s