william arkin made on. the scale of the disaster made the new construction a matter of national importance designed by general born star architect renzo piano the 1000 metre long span was completed in just over a year well continued day and night even during the worst of italy's coronavirus crisis its success is considered a model for the rest of italy. it was such a tragedy such a terrible scene but so happy to do the work you want to hear and so finding a. show that. from the air also we can do anyway good things but to the relatives who lost loved ones the new branch is no cause for celebration a group of said his sister brother and nor and that 2 children were killed in the disaster she says the effort put into the construction is a fresh source of pain if each. leg and it is tough to see the joy surrounding this construction. we would have been happy if this huge project was john earlier the old bridge should have been demolished before our families were destroyed pre-market and those 3 family to force