as a nursery. 770 wolseley is a historic street. the final eir concluded the demolition of the resources on the site and our proposed new construction would result in a substantial average change the significance and historic resources on the project base and that impact would be significant. the final identified the measures to reduce its impact. the first documentation of the historical resources. second implementation of a plan third permanent display of intensive materials and for the retention of the existing growth plan . while these mitigation measure would include the project impacts on historic resources those impacts would remain significant . additionally the final eir concluded impacts on resources and noise air-quality and biological resources would be significant for mitigated to a lesser degree. all other impacts in the proposed project would beless significant and almost resulted in no impact . the final eir analyzed three alternatives including the no project alternative and would be no changes to the project site.