we are planning to develop a station of our own wtu, uh, processing capacity of 24 million tons.his involves doubling the parks. e, this is the acquisition of additional locomotives, three more units, and, in the future, a phased systematic achievement of the design indicator of cargo turnover of 24 million tons. and then, ah, everything is in sync with the development, but of the eastern test site, because without uh the execution of work by russian railways, in principle, uh, excess capacity, it is not advisable to build the eastern test site is one of the largest transport projects in the world, it includes in the trans-siberian and baikal-amur railways. last year. over 140 million tons of cargo were sent through it, many directions are working at the limit of throughput to get rid of bottlenecks - this is a long, painstaking work that began back in 2013 year, when the first stage of the reconstruction at the eastern range was launched. more than a thousand objects were built and repaired, not only railway tracks, bridges and tunnels of the station, but also the related infras